Xilang station

Xilang

西塱
Guangzhou Metro
Platform 3 (Line 1 boarding platform)
Chinese name
Traditional Chinese西塱站
Transcriptions
Standard Mandarin
Hanyu PinyinXīlǎng Zhàn
Yue: Cantonese
JyutpingSai1Long5 zaam6
General information
LocationWest side of the intersection of Huadi Avenue South (花地大道南) and Hedong Road, southeast of Xilang Depot
Chongkou Subdistrict, Liwan District, Guangzhou, Guangdong
China
Coordinates23°03′52″N 113°13′56″E / 23.06444°N 113.23222°E / 23.06444; 113.23222
Operated byGuangzhou Metro Co. Ltd.
Foshan Railway Investment Construction Group Co. Ltd.
Line(s)
Platforms9 (3 island platforms and 3 side platforms)
Tracks7
Construction
Structure typeAt-grade
(Guangzhou Line 1)
Underground
(Guangfo Line/Foshan Line 1, Guangzhou Line 10)
AccessibleYes
Other information
Station code101 1001 2207 GF18
History
Opened
  •      Line 1: 28 June 1997 (1997-06-28)
  •      Line 10: 29 June 2025 (2025-06-29)
  •      Guangfo line: 3 November 2010 (2010-11-03)
Services
Preceding station Guangzhou Metro Following station
Terminus Line 1 Kengkou
Line 10 Huawei
towards Yangji East
Jushu Guangfo line Hedong
towards Lijiao
Future services
Fangcun
Terminus
Line 22 Nanjiao
towards Panyu Square
Location

Xilang station (Chinese: 西塱站; Jyutping: sai1long5 zaam6; Cantonese Yale: Sāilóhng Jaahm [note 1]), formerly Guanggang station[1] because of nearby Guangzhou Iron and Steel's headquarters when planning,[2] is an interchange station between Line 1, Line 10, and the Guangfo line of the Guangzhou Metro, and also the southern terminus of Line 1 and the western terminus of Line 10. It started operations on 28 June 1997. It was situated at the underground of Huadi Avenue South[3] in Fangcun, Liwan District.[4] The Guangfo line station started operations on 3 November 2010, and the Line 10 station started operations on 29 June 2025, making the station a 3-line interchange station.

During COVID-19 pandemic control rules from 29 May to 24 June 2021,[5] services of Xilang station had been largely restricted, as all entrances and exits are closed, passengers can't embark or disembark at this station,[6] and while the trains on both lines can still stop here, passengers can only transfer between both lines within the fare zone. All entrances have been reopened in the afternoon of 24 June.[7]

The currently under construction Line 22 will serve Xilang station by the end of 2025 and become the first 4-line interchange station of Guangzhou Metro. North of Xilang station, Line 1 is connected to Xilang Depot and south of the station, Line 10 is connected to Guanggang New Town Depot.

Station layout

The station consists of three sections, the Line 1 station on ground level, and the underground Line 10 and Guangfo line stations. The station as a whole is roughly in an inverted "L" shape, of which the station of Line 1 and the station of Line 10 are roughly parallel, and the three lines are connected by a paid area transfer passage. The station is surrounded by Huadi Avenue South, Xilang Depot, Xilang-Fangcun Bus Terminus and other nearby buildings.

Line 1

The Line 1 station is a three-storey station, the ground level are the platforms, the second floor is the concourse, and the third floor are offices.

In addition, the third floor of the station building was reserved for the use of the Guangfo Tram planned at the time, and the planned Guangfo line decided to build its concourse and platforms underground, and the pre-reserved structure of the above-ground third floor was converted into offices.

F3
Offices
- Offices
F2
Concourse
Line 1 Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Screening Facilities
Transfer passageways to  10  and  Guangfo 
G
Line 1 Platforms
Platform 5  1  termination platform (back to Xilang Depot)
Island platform, alighting passengers only
Platform 4
Platform 3
 1  towards Guangzhou East Railway Station (Kengkou) arrow for R
Island platform, boarding passengers only
Platform 2
Platform 1
 1  towards Guangzhou East Railway Station (Kengkou) arrow for R
Side platform, alighting passengers only
Exits A and B

Line 10

The Line 10 station is a four-storey underground station. The ground level is the exit and the transfer mezzanine towards Line 1, the first floor is the transfer level, the second floor is the concourse, the third floor is the equipment level, and the fourth floor are the platforms for Line 10.

This station is a cultural themed station on Line 10, and the theme is "Harmonious Life".[8]

G Mezzanine Towards  1  and  10 
Exits C and E
L1 Transfer concourse Towards  1   10   Guangfo 
L2
Concourse
 10  Lobby Ticket Machines, Customer Service, Shops, Security Screening Facilities
L3 Mezzanine Station Equipment
L4
Platforms
Side platform, doors will open on the right for alighting passengers only
Platform 9 arrow for L  10  termination Platform
Platform 8  10  towards Yangji East (Huawei) arrow for R
Side platform, doors will open on the right for boarding passengers only

Guangfo line

The Guangfo line station is a two-storey underground station. The first floor is the concourse and exit passageways, and the second floor is the platform for Guangfo line.

L1
Concourse
 Guangfo  Lobby Ticket Machines, Customer Service, Shops, Security Screening Facilities, Exits D, F, G
Via transfer concourse towards  1  and  10 
L2
Platforms
Platform 7 arrow for L  Guangfo  towards Xincheng Dong (Jushu)
Island platform, doors will open on the left
Platform 6  Guangfo  towards Lijiao (Hedong) arrow for R

Concourse

The concourse is divided into three parts, Line 1, Line 10 and Guangfo line. The Line 1 concourse is on the second above-ground floor, the Line 10 concourse is on the second underground floor, and the Guangfo line concourse is on the first underground floor. There are elevators, escalators and stairs in the fare-paid areas of the lines for passengers to access the platforms.

The station also has various convenience stores and shops, including a 7-Eleven on the Guangfo line concourse. The concourses also have self-service facilities including automatic vending machines, automatic camera booths and charging stations.

The station's restrooms and baby change are located in the paid area of the Line 10 concourse.[9]

Transfer methods

At present, the transfer between the three lines is carried out through the transfer building built by Line 10 and the transfer concourse on the first underground floor, and the transfer between Line 1 and Line 10 is carried out through the escalator connecting the ground transfer mezzanine of the transfer building to the Line 10 concourse on the second underground floor. As for the two lines transferring with the Guangfo line, they use the transfer concourse on the first underground floor, which connects to the south side of the Guangfo line concourse, and there are also escalators connecting the Line 1 and Line 10 concourses. In addition, passengers can also transfer between the three lines through a dedicated elevator connecting all four floors.

In the early days of the initial opening of the Guangfo line, there were three escalators and a set of stairs and wheelchair lifts between the Line 1 station and the Guangfo line station, and there were ramps and stairs in the underground passage to connect to the southwest corner of the Guangfo line concourse. Due to the construction needs of Line 10, the old transfer passage was closed on 22 March 2022 and a temporary transfer passage was opened, which connects the northeast corner of the Line 1 concourse on the second above ground floor and the northwest corner of the Guangfo line concourse on the first underground floor. The above ground to underground Guangfo line transfer makes use of the original existing stairs and elevators at Exit J, and a set of stairs are added to separate the two-way passenger flow.[10] After the opening of the Line 10 station, the new transfer passage was put into service, and the original temporary transfer passage was deactivated.[11]

Platforms

The Line 1 station uses two island platforms and a side platform located on ground level on the northwest side of the intersection of Huadi Avenue Middle and Huadi Avenue South. Line 1 adopts a turnback method before approach to the station, with the side platform and the westernmost island platform only for passengers to get off the train, and the island platform in the middle for passengers to get on the train. Line 10 has two side platforms located under the east side of the Line 1 station building. The Guangfo line has an island platform located underneath the eastern bloc of the Line 1 depot.

This station was originally equipped with the two characters "Xilang" in the Chinese SinoType computer calligraphy font on the Guangfo line platform, but after the station was renamed, because the computer font did not support the character "塱", it was replaced with the two characters "Xilang" in ordinary Ming typefaces style. The small relief calligraphy characters on the Line 1 platform maintained the same Chinese script before and after the name change, and the characters "塱" were spliced together with the characters "lang" (朗) and "soil" (土).

To the north of the platform of Line 1 of this station is the Xilang Depot, so some Line 1 trains will be withdrawn from service after arriving at this station during the morning and evening rush hours and for the last services of the day. These trains will enter the west or middle of the station to clear passengers, while the train and platform will broadcast a service broadcast to remind passengers not to stay on the train, then close the door and immediately return to the depot.

There is a set of crossover lines at both ends of the Line 10 platform for trains to turnback, and under normal circumstances, the crossover line at the north end of the station will be used for post-station turnback, and in addition, there are two other rails to the Guanggang New Town Depot on the main line in the direction of Huawei station.

There is a set of double-storage lines on the east side of the Guangfo line platform, and when there is a fault in the section east of Xilang, the Guangfo line can use the storage line to turnback, and use this station as the temporary terminus, in which passengers can use other means of transportation to each station along the way from Hedong to Lijiao. When this station was the initial terminus between 2010 and 2015, the storage lines were also used for train turnback.

Line 1 platform 1 panorama (alighting platform)
Line 1 platform 3 panorama (boarding platform)
Guangfo line platform panorama

Exits

The station has 6 exits for entering and exiting, distributed between the Line 1, Line 10 and Guangfo line concourses. In its initial opening, the station had Exits A and B, whilst Exits D and J were added in the Guangfo line station's initial opening. On 28 September 2016, Exit F was added,[12] and on 1 January 2022, Exit G was added. In order to cooperate with the construction of the Line 10 station, the original Exits A and B were closed and dismantled on 14 January 2022, new Exits A and B will be constructed on the south side of the concourse, equipped with escalators and disabled elevators.[13] Exit J was closed on 22 January the same year to facilitate construction of the temporary transfer passage. When the Line 10 station was opened, Exits C and E were added.

In addition, there are multiple sets of turnstiles in the middle of the west side of the Line 1 concourse, which can be used by employees to travel directly between the station and the nearby Xilang Depot.

Exit letter Gallery Exit location Nearby
 1  Concourse
A Huadi Avenue South Huadi Avenue Middle
Bus interchange Public Bus: Xilang Station Stop, Xilang-Fangcun Bus Terminus
B Huadi Avenue South Huadi Avenue Middle
Bus interchange Public Bus: Xilang Station Stop, Xilang-Fangcun Bus Terminus
 10  Concourse
C Huadi Avenue South
E Huadi Avenue South
 Guangfo  Concourse
D Huadi Avenue Middle Huadi Avenue South
F Huadi Avenue Middle Huadi Avenue South
Bus interchange Public Bus: Huadi Avenue Middle Stop (Northbound), Longxi Interchange South (Kengkou Archway) Stop (Northbound), Hedong Road West Stop (Westbound)
G Huadi Avenue Middle Guangzhou First Municipal People’s Hospital Hedong Branch
Bus interchange Public Bus: Huadi Avenue Middle Stop (Southbound)

Usage

Since the station opened in 1997, the passenger flow has been low for more than a decade, and the station is relatively large yet deserted, as there are only Guangzhou Iron and Steel's headquarters (demolished), agricultural fields and urban villages nearby, and there are no large residential areas, commercial centers or tourist attractions. This situation remained in place until 3 November 2010, when the Guangfo line opened. As it was still a free ride day for the Asian Games, a large number of passengers waiting to take the Guangfo line gathered in the Line 1 concourse before 2 p.m., which was unprecedented in the 13 years since the station opened. The excessive number of passengers who were in a hurry to "try the new" also caused chaos for a time. Passenger flow control was implemented for more than five hours at the station.[14]

At present, as the first transfer station after the Guangfo Metro entered Guangzhou, the station has changed the deserted situation of more than ten years in the past, and many passengers between the two cities pass through this station every day, becoming an important transfer station of the Guangzhou Metro. As the Guangfo Metro continues to extend into Haizhu District, passengers travelling between Fangcun and Haizhu will also change trains at this station. At present, during the evening peak hours on weekdays and public holidays, there will be a large number of passengers waiting on platform 7 of the Guangfo line (Foshan direction), and the waiting queue will be extended to the opposite platform 6. At the same time, due to the relatively large gap in the operating capacity between Line 1 and the Guangfo line, it is necessary to implement passenger flow control measures at this station to reduce the speed at which passengers change from Line 1 to the Guangfo line to maintain the Guangfo line operation order.

History

Planning

In 1987, the then Guangzhou municipal government was ready to introduce French capital for subway construction. This station appeared as a station for the first phase of the project (Line 1) and was called the Guangzhong Highway station. Later, the "Cross Line" plan was confirmed, and construction of this station was also confirmed, but the name was changed to Guanggang station, and then changed to Xilang station before it opened.[15]

Line 1

On 28 December 1993, construction of Line 1 officially started. This station was also being built along with its other stations. The five stations from this station to Huangsha were opened for service on 28 June 1997.[16] The opening ceremony of the first section was held in the square in front of the station, and the first train of Line 1 also departed from the station to Huangsha Station.

In 2004, the metro company decided to install screen doors or half-height safety doors at all stations on Line 1, including this station.[17] On 22 July 2009, the half-height safety gate of the station was put into use, which meant that all the stations of Line 1 and Guangzhou Metro are equipped with shielded doors or half-height safety doors.[18]

In September 2014, after the first installation of spray fans at the three elevated stations of Line 6 was so effective that the metro company decided to install 207 spray fans at the existing 12 at-grade/elevated stations (including this station). At present, the spray fan located at the platform of this station has been installed in place.

Line 10

Construction of the main structure of the Line 10 station started in April 2022.[19] Construction of the outer main structure of the station was completed in July 2022,[20] and the roof slab was sealed in July 2023.[21]

During the construction of the Line 10 station, it was necessary to use the original Exits/Entrances A, B and J and the transfer passage between Line 1 and Guangfo line. On 14 January 2022, the old Exits A and B were officially closed and relocated and Exit J and the original transfer passage were also closed one after another to coincide with the construction of the Line 10 station.[13] The temporary transfer passage between Line 1 and the Guangfo Line was opened on 22 March 2022.[10]

On 31 March 2025, the Line 10 station completed the "three rights" transfer. On 29 June the same year, the station body of Line 10 and the new transfer passage officially opened, and at the same time, the temporary transfer passage was closed.[22]

Guangfo line

In 2007, construction began at various stations along the Guangfo line.[23] On 23 April 2009, during construction of the section from the station to Jushu, the ground subsidence occurred near the Science and Technology Museum of the Pearl River Fisheries Research Institute on Xingyu Road, Xilang.[24] On 28 and 29 October 2010, it was opened to some citizens of the two cities for trial rides.[25] At 2 p.m. on 3 November of the same year, the Guangfo line section of the station was opened together with the entire Guangfo Metro, and the station officially became an interchange station.[14]

Station name change

Although this site is located in Xilang, Fangcun, Liwan District, in view of the fact that there was no "塱" character in the computer font at that time, the homophone "lang" (朗) was used (both characters are "lǎng" in Chinese pinyin, and long5 in Cantonese spelling). This character has now been added to the character library (Unicode U+5871).[note 1]

In 2011, a local villager called the hotline of the mayor of Guangzhou and asked Su Zequn, then deputy mayor, to change the name, and related issues began to attract public attention. At the time, the metro company said that it would cost 10 million yuan to change the name and not change it to save costs, but many local municipal facilities had already been renamed.[26] It was not until the end of the first quarter of 2018 that Guangzhou Metro formally applied to the Guangzhou Civil Affairs Bureau to rename the Chinese character name of the station as Xilang Station (西塱站).[27] Guangzhou Metro announced on 10 August the same year that it would officially change the name of the station when the new lines open at the end of the year, and from September, the content of the passenger interface such as the station image sign column, 500-meter guide column, line network map, and ticketing equipment will be replaced one after another. The Chinese characters "西塱" finally came into effect on 28 December the same year with the opening of the new lines.[28]

Station closure due to COVID restrictions

During COVID-19 pandemic control rules from 29 May to 24 June 2021, the station's services had been largely restricted, as from 29 May the station only allowed exiting,[5] and from 7 June all entrances/exits effectively closed, which meant that passengers couldn't embark or disembark at this station,[6] and while the trains on both lines can still stop here, passengers can only transfer between both lines within the fare zone. All entrances have been reopened in the afternoon of 24 June.[7]

Future development

Line 22 will stop at this station by the end of 2025, making the station an important four-line interchange hub. However, since the station of Line 1 does not have any transfer interfaces, and its design with the depot cannot meet future needs, therefore it needed to be renovated and expanded on a large scale. According to the relevant planning scheme, the station will be gradually renovated while ensuring that the operation of the existing lines will not be affected.[29]

The Line 22 station is located on the west side of the current Line 1 station and is a four-storey underground station with an island platform. During construction, a two island and one side platform station was simultaneously built on the first underground floor for the underground conversion of the Line 1 station in the future. The second and third underground floors are reserved for access to future new buildings.[30]

The roof slab of this section of the station was sealed in June 2024.[31]

Line 22 layout during the initial opening

L1
 1  Platforms
Platform 5  1  reserved track
Island platform, alighting passengers only
Platform 4
Platform 3
 1  reserved track
Island platform, boarding passengers only
Platform 2
Platform 1
 1  reserved track
Side platform, alighting passengers only
L2
Concourse
Transfer passage Towards  10  and  Guangfo 
 22  Lobby Ticket Machines, Customer Service, Shops, Security Screening Facilities
L3 Mezzanine Station Equipment
L4
 22  Platforms
Platform 10 arrow for L  22  towards Fangcun (terminus)
Island platform, doors will open on the left
Platform 11  22  towards Panyu Square (Nanjiao) arrow for R

Subsequent construction

After the completion of station works of Line 10, Line 22 and the new Line 1, the relevant track section from Kengkou to this station and the Xilang Depot will be converted to underground operation. The existing Line 1 station building will be demolished, and a transfer concourse will be built on the second underground floor of the original site, so as to integrate the Line 1/22 station and the Line 10 station and optimize the transfer conditions between the lines. The space vacated by the station, track, and depot space on ground level will be commercially developed into a comprehensive transportation hub integrating shopping malls, office buildings, and residential buildings, as well as green spaces.[29][32]

Notes

  1. ^ a b Its Chinese name was 西朗站 before September 2018, due to lack of Unicode CJK Unified Ideographs support in early ticket system and signal system, where the 塱 is coded U+5871 in the block

References

  1. ^ simplified Chinese: 广钢站; traditional Chinese: 廣鋼站; pinyin: Guǎnggāng Zhàn; Jyutping: gwong2gong3 zaam6; lit. 'Guangzhou Iron and Steel Plant Station'
  2. ^ 地鐵三四號線六站更名 "廣州豐田"成站名 (in Simplified Chinese). Archived from the original on 30 September 2011. Retrieved 23 March 2009.
  3. ^ 花地大道南; Huādì Dàdào Nán; faa1dei6 daai6dou6 naam4; 'Flower Ground South Avenue'
  4. ^ Xilang
  5. ^ a b 李天研 (29 May 2021). "西塱站、龙溪站等8个地铁站运营有调整" [The operation of 8 subway stations including Xilang Station and Longxi Station has been adjusted]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 29 May 2021. Retrieved 12 July 2025.
  6. ^ a b 李天研 (6 June 2021). "6月7日起,芳村区域所有地铁站停运" [Starting from June 7, all subway stations in Fangcun area will be suspended]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 6 June 2021. Retrieved 12 July 2025.
  7. ^ a b 郑慧梓 (24 June 2021). "广州芳村片区公交恢复了!首班复行车已开出" [Public transportation in Fangcun area of Guangzhou has resumed! The first train has departed]. Nanfang Daily (in Simplified Chinese). Archived from the original on 10 May 2023. Retrieved 12 July 2025.
  8. ^ 郑慧梓 (26 March 2025). "广州地铁10号线长啥样?"一区一色"、设3座特色站" [What does Guangzhou Metro Line 10 look like? "One area, one color", with 3 special stations]. Nanfang Daily (in Simplified Chinese). Archived from the original on 26 March 2025. Retrieved 11 July 2025.
  9. ^ "广州地铁卫生间、母婴室和AED信息" [Guangzhou Metro restrooms, baby change rooms and AED information]. Guangzhou Metro (in Simplified Chinese). Guangzhou. 27 June 2025. Archived from the original on 22 July 2023. Retrieved 11 July 2025.
  10. ^ a b "西塱站临时换乘通道今日启用" [Xilang Station temporary transfer channel opened today]. Guangzhou Metro (in Simplified Chinese). 22 March 2022. Archived from the original on 11 May 2023. Retrieved 12 July 2025 – via Official WeChat Account.
  11. ^ 邱日华 (28 June 2025). "广州地铁双线齐发,大沥里水获益、"候鸟"通勤更便捷" [Guangzhou Metro doubles lines, Dali and Lishui benefit, and "migrant birds" commute more convenient]. Nanfang Daily (in Simplified Chinese). Archived from the original on 29 June 2025. Retrieved 11 July 2025.
  12. ^ "广佛地铁西朗站F出入口正式开通啦!" [Exit F of Guangzhou-Foshan Metro Xilang Station is officially opened!]. Guangfo Metro (in Simplified Chinese). 28 September 2016. Archived from the original on 7 June 2020. Retrieved 11 July 2025.
  13. ^ a b 李天研 (13 January 2022). "西塱站将"大变身"!1号线转入"地下",车站上盖商场" [Xilang Station will be transformed! Line 1 will be moved underground, and a shopping mall will be built above the station]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 21 January 2023.
  14. ^ a b 杨进 (4 November 2010). "17万人挤爆广佛线 西朗站被迫一度暂停换乘" [170,000 people crowded the Guangfo Line, and Xilang Station was forced to temporarily suspend transfers]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2 February 2021. Retrieved 11 July 2025 – via Sohu News.
  15. ^ 朱蕾 (10 May 2006). "地铁三四号线6站更名" [Six stations on Metro Lines 3 and 4 renamed]. Information Times (in Simplified Chinese). Archived from the original on 27 June 2022. Retrieved 12 July 2025 – via Sina News.
  16. ^ 梁怿韬; 刘勇 (27 June 2017). "【广州地铁20岁】 市民讲述我的地铁记忆" [【Guangzhou Metro turns 20】 Citizens tell me about their metro memories]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 7 June 2020. Retrieved 12 July 2025.
  17. ^ 李妍 (24 December 2004). "广州地铁1号线加装新式屏蔽门保障乘客安全" [Guangzhou Metro Line 1 installs new platform screen doors to ensure passenger safety]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 8 May 2020. Retrieved 12 July 2025 – via Sina News.
  18. ^ 李慧燕 (23 July 2009). "一号线屏蔽门全线完工" [The platform screen doors of Line 1 have been completed]. Information Times (in Simplified Chinese). Archived from the original on 11 May 2023. Retrieved 12 July 2025 – via Sina News.
  19. ^ 谭超 (18 April 2022). "双统筹双胜利:广州地铁十号线土建工程完成四成" [Double coordination and double victory: Guangzhou Metro Line 10 civil engineering project completed 40%]. Nanfang Daily (in Simplified Chinese). Archived from the original on 11 May 2023. Retrieved 12 July 2025.
  20. ^ 李天研 (20 July 2022). "西塱站换乘通道"让路" 地铁十号线工程有新突破" [Xilang Station transfer passage "gives way" and Metro Line 10 project has a new breakthrough] (in Simplified Chinese). Guangzhou Daily. Archived from the original on 20 July 2022.
  21. ^ 郑慧梓 (17 July 2023). "10号线西塱站主体结构封顶!广州在建地铁进度条刷新" [The main structure of Line 10 Xilang Station has been capped! The progress bar of Guangzhou's subway under construction has been updated]. Nanfang Daily (in Simplified Chinese). Archived from the original on 18 July 2023. Retrieved 12 July 2025.
  22. ^ 严艺文 (29 June 2025). "期待已久!街坊们见证广州地铁"X形"对角线开通" [Long awaited! Residents witness the opening of Guangzhou Metro's "X-shaped" diagonal line]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 29 June 2025. Retrieved 12 July 2025 – via Sina Finance.
  23. ^ "总投资146.75亿 广佛地铁动工预计2010年开通" [With a total investment of RMB 14.675 billion, the Guangzhou-Foshan Metro started construction and is expected to open in 2010]. Southern Metropolis Daily (in Simplified Chinese). 29 June 2007. Archived from the original on 4 March 2016. Retrieved 12 July 2025 – via Guangdong Provincial People's Government.
  24. ^ "芳村西塱又见地陷 地铁广佛线被迫停工" [Land subsidence in Fangcun Xilang again, Guangzhou-Foshan Metro Line forced to stop construction]. Southern Network (in Simplified Chinese). 24 April 2009. Archived from the original on 4 May 2014. Retrieved 12 July 2025 – via Ocean Network.
  25. ^ 熊薇 (29 October 2010). "广佛地铁昨日开始试乘,亚运期间"逢包必检"" [Guangzhou-Foshan Metro started trial ride yesterday, "all bags must be checked" during the Asian Games]. Southern Metropolis Daily (in Simplified Chinese). Archived from the original on 11 May 2023. Retrieved 12 July 2025 – via Sina News.
  26. ^ 于杨 (24 November 2011). "西塱村民盼纠正"西朗"站名 改名或花千万" [Villagers in Xilang hope to correct the name of the station, changing the name may cost tens of millions]. New Express Daily (in Simplified Chinese). Archived from the original on 2 May 2014. Retrieved 12 July 2025.
  27. ^ "公开征求对市轨道交通一号线"西朗站"更名意见" [Public solicitation of opinions on the name change of "Xilang Station" on Metro Line 1]. Guangzhou Civil Affairs Bureau (in Simplified Chinese). 29 March 2018. Archived from the original on 6 June 2019. Retrieved 12 July 2025.
  28. ^ 梁怿韬 (11 October 2018). "将错就错21年后 广州地铁站西朗正名为西塱" [After 21 years of making a mistake, Guangzhou Metro Station Xilang was renamed]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 11 October 2018. Retrieved 12 July 2025.
  29. ^ a b 李天研 (14 January 2022). "西塱地铁站启动"变身三步走",市民出行更方便" [Xilang Metro Station launches "three-step transformation" to make travel more convenient for citizens]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 14 January 2022. Retrieved 12 July 2025.
  30. ^ 农兴中; 郑翔; 刘健美; 王迪军; 袁大军, eds. (2024). 湾区纵贯线 市域新速度—广州市轨道交通十八号线和二十二号线设计解析 [The Bay Area Longitudinal Line, a New Speed for the City—Analysis on the Design of Guangzhou Metro Line 18 and Line 22] (in Simplified Chinese). Beijing: People's Communications Press. p. 143. ISBN 978-7-114-19190-9.
  31. ^ 郑慧梓 (17 June 2024). "广州地铁更新在建线路进度条!二十二号线后通段西塱站封顶" [Guangzhou Metro updates the progress bar of the lines under construction! Xilang Station of Line 22 has been capped]. Nanfang Daily (in Simplified Chinese). Archived from the original on 17 June 2024. Retrieved 12 July 2025.
  32. ^ 杜娟 (11 September 2024). "全程不停运!西塱地铁站、车辆段将更新改造" [No interruption in operation! Xilang subway station and train depot will be updated and renovated]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 11 September 2024. Retrieved 12 July 2025.