List of metro systems in Europe

The following list of metro systems in Europe is ordered alphabetically by country and city. Although the term metro (or métro, metró, metrosu, metropoliteni, or metropolitano / metropolitana in Southern Europe, or mietrapaliten / metropoliten in Eastern Europe) is widespread in Europe, there are also other names for rapid transit systems, such as subway, underground, tube, T-bane, tunnelbana or U-Bahn. The list contains systems that can be defined as rapid transit with a completely segregated alignment, including light capacity metros, as well as light rail systems with a considerable section with a completely segregated alignment. Systems like these are grouped by Mark Ovenden as "Urban rail systems" in the 2007 version of the book Metro/Transit maps of the world.[1]
Armenia
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Yerevan Metro Երևանի մետրոպոլիտեն |
Locale | Yerevan | 1 | ![]() |
|||
Began operation | 7 March 1981 | ||||||
Lines in operation | 1 | ||||||
No. of stations | 10 | ||||||
Network length | 13.4 km (8.3 mi) | ||||||
Ridership | 29.6 million (2023) | ||||||
Austria
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Vienna U-Bahn U-Bahn Wien |
Locale | Vienna | ![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
![]() ![]() |
![]() |
|
Began operation | 8 May 1976[a] | ||||||
Lines in operation | 5 | ||||||
No. of stations | 98 | ||||||
Network length | 83.3 km (51.8 mi) | ||||||
Ridership | 459.8 million (2019) | ||||||
The Tyrolian village of Serfaus also has a short metro, the U-Bahn Serfaus, which uses cushions instead of rails.
Azerbaijan
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Baku Metro Bakı Metropoliteni |
Locale | Baku | (West-East extension - Completion Loop) Blue Line Yellow Line |
![]() |
|||
Began operation | 9 November 1967 | ||||||
Lines in operation | 3 | ||||||
No. of stations | 27 | ||||||
Network length | 40.7 km (25.3 mi) | ||||||
Ridership | 229.7 million (2019) | ||||||
Belarus
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Minsk Metro Мінскі Mетрапалітэн |
Locale | Minsk | ![]() ![]() ![]() |
![]() |
![]() |
||
Began operation | 30 June 1984 | ||||||
Lines in operation | 3 | ||||||
No. of stations | 33 | ||||||
Network length | 40.8 km (25.4 mi) | ||||||
Ridership | 226.3 million (2021) | ||||||
Belgium
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Brussels Metro Métro de Bruxelles Brusselse Metro |
Locale | Brussels | 1 2 5 6 | 3 | ![]() |
||
Began operation | 20 September 1976 | ||||||
Lines in operation | 2[b] | ||||||
No. of stations | 59 | ||||||
Network length | 39.9 km (24.8 mi) | ||||||
Ridership | 87.6 million (2020) | ||||||
![]() Charleroi Light rail[c] Métro Léger de Charleroi |
Locale | Charleroi | M1 M2 M3 M4 | M5 | ![]() |
||
Began operation | 21 June 1976 | ||||||
Lines in operation | 2[d] | ||||||
No. of stations | 21 | ||||||
Network length | 17.0 km (10.6 mi) | ||||||
Ridership | 5.6 million (2019) | ||||||
Bulgaria
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Sofia Metro Софийски Mетрополитен |
Locale | Sofia | 1 2 3 4 | 3 (North extension & branch) | 1 (South extension) 2 (South extension & branch) |
![]() |
|
Began operation | 28 January 1998 | ||||||
Lines in operation | 4[e] | ||||||
No. of stations | 47 | ||||||
Network length | 52.0 km (32.3 mi) | ||||||
Ridership | 164.2 million (2023) | ||||||
Czechia
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Prague Metro Pražské Metro |
Locale | Prague | A B C | D | D (North extension & branch) | ![]() |
|
Began operation | 9 May 1974 | ||||||
Lines in operation | 3 | ||||||
No. of stations | 58 | ||||||
Network length | 65.4 km (40.6 mi) | ||||||
Ridership | 568 million (2021) | ||||||
Denmark
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Copenhagen Metro Københavns Metro |
Locale | Copenhagen | ![]() ![]() ![]() ![]() |
![]() |
![]() |
||
Began operation | 19 October 2002 | ||||||
Lines in operation | 4 | ||||||
No. of stations | 39 | ||||||
Network length | 38.2 km (23.7 mi) | ||||||
Ridership | 119.7 million (2023) | ||||||
Finland
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Helsinki Metro Helsingin metro Helsingfors metro |
Locale | Helsinki | M1 M2 | M2 (East extension) M (Second Line) |
![]() |
||
Began operation | 2 August 1982 | ||||||
Lines in operation | 1[f] | ||||||
No. of stations | 30 | ||||||
Network length | 43 km (26.7 mi) | ||||||
Ridership | 79 million (2023) | ||||||
France
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Lille Metro Métro de Lille |
Locale | Lille | ![]() ![]() |
![]() ![]() |
![]() |
||
Began operation | 25 April 1983 | ||||||
Lines in operation | 2 | ||||||
No. of stations | 60 | ||||||
Network length | 45.0 km (28.0 mi) | ||||||
Ridership | 122.87 million (2023) | ||||||
![]() Lyon Metro Métro de Lyon |
Locale | Lyon | ![]() ![]() ![]() ![]() |
![]() |
|||
Began operation | 9 December 1974 | ||||||
Lines in operation | 4 | ||||||
No. of stations | 42 | ||||||
Network length | 34.4 km (21.4 mi) | ||||||
Ridership | 208.21 million (2023) | ||||||
![]() Marseille Metro Métro de Marseille |
Locale | Marseille | ![]() ![]() |
![]() |
![]() |
||
Began operation | 26 November 1977 | ||||||
Lines in operation | 2 | ||||||
No. of stations | 31 | ||||||
Network length | 22.7 km (14.1 mi) | ||||||
Ridership | 71.3 million (2023) | ||||||
![]() Paris Métro Métro de Paris |
Locale | Paris | ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
|
Began operation | 19 July 1900 | ||||||
Lines in operation | 14[g] | ||||||
No. of stations | 321 | ||||||
Network length | 245.6 km (152.6 mi) | ||||||
Ridership | 1476 million (2024) | ||||||
![]() Rennes Metro Métro de Rennes |
Locale | Rennes | ![]() ![]() |
![]() |
|||
Began operation | 15 March 2002 | ||||||
Lines in operation | 2 | ||||||
No. of stations | 28 | ||||||
Network length | 22.4 km (13.9 mi) | ||||||
Ridership | 59.4 million (2023) | ||||||
![]() Toulouse Metro Métro de Toulouse |
Locale | Toulouse | ![]() ![]() |
![]() ![]() |
![]() |
||
Began operation | 26 June 1993 | ||||||
Lines in operation | 2 | ||||||
No. of stations | 38 | ||||||
Network length | 28.2 km (17.5 mi) | ||||||
Ridership | 112.9 million (2023) | ||||||
Georgia
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Tbilisi Metro თბილისის მეტროპოლიტენი |
Locale | Tbilisi | ![]() |
||||
Began operation | 11 January 1966 | ||||||
Lines in operation | 2 | ||||||
No. of stations | 23 | ||||||
Network length | 28.6 km (17.8 mi) | ||||||
Ridership | 138.8 million (2019) | ||||||
Germany
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Berlin U-Bahn U-Bahn Berlin |
Locale | Berlin | ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
|||
Began operation | 15 January 1902 | ||||||
Lines in operation | 8[h] | ||||||
No. of stations | 175 | ||||||
Network length | 155.4 km (96.6 mi) | ||||||
Ridership | 596 million (2019) | ||||||
![]() Frankfurt U-Bahn U-Bahn Frankfurt |
Locale | Frankfurt | ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
|||
Began operation | 4 October 1968 | ||||||
Lines in operation | 4[i] | ||||||
No. of stations | 86 | ||||||
Network length | 64.9 km (40.3 mi) | ||||||
Ridership | 132.2 million (2016) | ||||||
![]() Hamburg U-Bahn U-Bahn Hamburg |
Locale | Hamburg | ![]() ![]() ![]() ![]() |
![]() ![]() |
![]() ![]() |
![]() |
|
Began operation | 15 February 1912 | ||||||
Lines in operation | 3[j] | ||||||
No. of stations | 93 | ||||||
Network length | 106.4 km (66.1 mi) | ||||||
Ridership | 249.5 million (2019) | ||||||
![]() Munich U-Bahn U-Bahn München |
Locale | Munich | ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
![]() |
|
Began operation | 19 October 1971 | ||||||
Lines in operation | 3[k] | ||||||
No. of stations | 96 | ||||||
Network length | 103.1 km (64.1 mi) | ||||||
Ridership | 429 million (2019) | ||||||
![]() Nuremberg U-Bahn U-Bahn Nürnberg |
Locale | Nuremberg | ![]() ![]() ![]() |
![]() |
![]() |
||
Began operation | 1 March 1972 | ||||||
Lines in operation | 2[l] | ||||||
No. of stations | 49 | ||||||
Network length | 38.2 km (23.7 mi) | ||||||
Ridership | 114.6 million (2019) | ||||||
Greece
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Athens Metro Μετρό Αθήνας |
Locale | Athens | ![]() ![]() ![]() |
![]() |
![]() ![]() ![]() |
![]() |
|
Began operation | 16 September 1904[m] | ||||||
Lines in operation | 3 | ||||||
No. of stations | 71[n] | ||||||
Network length | 93.5 km (58.1 mi)[o] | ||||||
Ridership | 510 million (2024 - projected) | ||||||
![]() Thessaloniki Metro Μετρό Θεσσαλονίκης |
Locale | Thessaloniki | ![]() |
![]() |
![]() |
||
Began operation | 30 November 2024 | ||||||
Lines in operation | 1 | ||||||
No. of stations | 13 | ||||||
Network length | 14.28 km (8.9 mi) | ||||||
Ridership | 116.8 million (projected) | ||||||
Hungary
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Budapest Metro Budapesti Metró |
Locale | Budapest | ![]() ![]() ![]() ![]() |
![]() |
![]() |
||
Began operation | 2 May 1896 | ||||||
Lines in operation | 4 | ||||||
No. of stations | 48 | ||||||
Network length | 39.7 km (24.7 mi) | ||||||
Ridership | 382.6 million (2023) | ||||||
Italy
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Brescia Metro Metropolitana di Brescia |
Locale | Brescia | 1 | ![]() |
|||
Began operation | 2 March 2013 | ||||||
Lines in operation | 1 | ||||||
No. of stations | 17 | ||||||
Network length | 13.7 km (8.5 mi) | ||||||
Ridership | 18.7 million (2019) | ||||||
![]() Catania Metro Metropolitana di Catania |
Locale | Catania | 1 | 1 North-West & South-West extensions | ![]() |
||
Began operation | 27 June 1999 | ||||||
Lines in operation | 1 | ||||||
No. of stations | 10 | ||||||
Network length | 8.8 km (5.5 mi) | ||||||
Ridership | 5.8 million (2018) | ||||||
![]() Genoa Metro Metropolitana di Genova |
Locale | Genoa | 1 | 1 West extension | 1 East & West extensions | ![]() |
|
Began operation | 13 June 1990 | ||||||
Lines in operation | 1 | ||||||
No. of stations | 8 | ||||||
Network length | 7.1 km (4.4 mi) | ||||||
Ridership | 5.8 million (2018) | ||||||
![]() Milan Metro Metropolitana di Milano |
Locale | Milan | ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() ![]() ![]() ![]() ![]() |
![]() |
|
Began operation | 1 November 1964 | ||||||
Lines in operation | 5 | ||||||
No. of stations | 125 | ||||||
Network length | 111.8 km (69.5 mi) | ||||||
Ridership | 386.8 million (2019) | ||||||
![]() Naples Metro Metropolitana di Napoli |
Locale | Naples | ![]() ![]() ![]() |
![]() |
![]() |
![]() |
|
Began operation | 28 March 1993 | ||||||
Lines in operation | 3 | ||||||
No. of stations | 30 | ||||||
Network length | 34.5 km (21.4 mi) | ||||||
Ridership | 43.5 million (2019) | ||||||
![]() Rome Metro Metropolitana di Roma |
Locale | Rome | ![]() ![]() ![]() |
![]() |
![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
|
Began operation | 9 February 1955 | ||||||
Lines in operation | 3 | ||||||
No. of stations | 73 | ||||||
Network length | 59.4 km (36.9 mi) | ||||||
Ridership | 320 million (2018) | ||||||
![]() Turin Metro Metropolitana di Torino |
Locale | Turin | 1 | 1 West extension | 1 South extension 2 |
![]() |
|
Began operation | 4 February 2006 | ||||||
Lines in operation | 1 | ||||||
No. of stations | 23 | ||||||
Network length | 15.1 km (9.4 mi) | ||||||
Ridership | 42.5 million (2018) | ||||||
Netherlands
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Amsterdam Metro Amsterdamse Metro |
Locale | Amsterdam | 50 51 52 53 54 | 52 (Schiphol extension) | ![]() |
||
Began operation | 14 October 1977 | ||||||
Lines in operation | 3[p] | ||||||
No. of stations | 39 | ||||||
Network length | 42.7 km (26.5 mi) | ||||||
Ridership | 111.3 million (2019) | ||||||
![]() Rotterdam Metro Rotterdamse Metro |
Locale | Rotterdam | A B C D E | ![]() |
|||
Began operation | 9 February 1968 | ||||||
Lines in operation | 2[q] | ||||||
No. of stations | 70 | ||||||
Network length | 100.6 km (62.5 mi) | ||||||
Ridership | 99 million (2019) | ||||||
Norway
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Oslo Metro Oslo T-Bane |
Locale | Oslo | ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() ![]() |
![]() |
|
Began operation | 22 May 1966 | ||||||
Lines in operation | 3[r] | ||||||
No. of stations | 101 | ||||||
Network length | 85.0 km (52.8 mi) | ||||||
Ridership | 74 million (2020) | ||||||
Poland
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Warsaw Metro Metro Warszawskie |
Locale | Warsaw | ![]() ![]() |
![]() |
![]() |
![]() |
|
Began operation | 7 April 1995 | ||||||
Lines in operation | 2 | ||||||
No. of stations | 39 | ||||||
Network length | 41.3 km (25.7 mi) | ||||||
Ridership | 195.4 million (2019) | ||||||
Portugal
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Lisbon Metro Metropolitano de Lisboa |
Locale | Lisbon | ![]() ![]() ![]() ![]() |
![]() |
![]() |
![]() |
|
Began operation | 29 December 1959 | ||||||
Lines in operation | 4 | ||||||
No. of stations | 56 | ||||||
Network length | 44.5 km (27.7 mi) | ||||||
Ridership | 184.6 million (2019) | ||||||
![]() Porto Metro[s] Metro do Porto |
Locale | Porto | ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
||
Began operation | 7 December 2002 | ||||||
Lines in operation | 2[t] | ||||||
No. of stations | 85 | ||||||
Network length | 70.1 km (43.6 mi) | ||||||
Ridership | 89.8 million (2024)[u] | ||||||
Romania
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Bucharest Metro Metroul din București |
Locale | Bucharest | M1 M2 M3 M4 M5 | North extension M6 |
M2 North extension M5 East extension M6 |
![]() |
|
Began operation | 16 November 1979 | ||||||
Lines in operation | 5[v] | ||||||
No. of stations | 64 | ||||||
Network length | 80.1 km (49.8 mi) | ||||||
Ridership | 179.2 million (2019) | ||||||
Russia
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Kazan Metro Казанский метрополитен Казан метросы |
Locale | Kazan | 1 | 2 | 1 North & South extensions 2 North extension 3 4 |
![]() |
|
Began operation | 27 August 2005 | ||||||
Lines in operation | 1 | ||||||
No. of stations | 11 | ||||||
Network length | 16.8 km (10.4 mi) | ||||||
Ridership | 21.5 million (2019) | ||||||
![]() Moscow Metro Московский метрополитен |
Locale | Moscow | ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() ![]() ![]() ![]() ![]() |
![]() |
|
Began operation | 15 May 1935 | ||||||
Lines in operation | 17 | ||||||
No. of stations | 271 | ||||||
Network length | 471.7 km (293.1 mi) | ||||||
Ridership | 2257.7 million (2024) | ||||||
![]() Nizhny Novgorod Metro Нижегородское метро |
Locale | Nizhny Novgorod | ![]() ![]() |
![]() |
![]() ![]() ![]() |
![]() |
|
Began operation | 20 November 1985 | ||||||
Lines in operation | 2 | ||||||
No. of stations | 15 | ||||||
Network length | 21.6 km (13.4 mi) | ||||||
Ridership | 20.4 million (2020) | ||||||
![]() Saint Petersburg Metro Петербургский метрополитен |
Locale | Saint Petersburg | ![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
![]() ![]() ![]() ![]() ![]() |
![]() |
|
Began operation | 15 November 1955 | ||||||
Lines in operation | 5 | ||||||
No. of stations | 64 | ||||||
Network length | 124.8 km (77.5 mi) | ||||||
Ridership | 495 million (2020) | ||||||
![]() Samara Metro Самарское метро |
Locale | Samara | 1 | 1 West extension & Branch 2 3 |
![]() |
||
Began operation | 27 August 2005 | ||||||
Lines in operation | 1 | ||||||
No. of stations | 10 | ||||||
Network length | 12.7 km (7.9 mi) | ||||||
Ridership | 8.8 million (2020) | ||||||
Spain
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Barcelona Metro Metro de Barcelona |
Locale | Barcelona | ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
|
Began operation | 30 December 1924 | ||||||
Lines in operation | 9[w] | ||||||
No. of stations | 166 | ||||||
Network length | 147.2 km (91.5 mi) | ||||||
Ridership | 440 million (2023) | ||||||
![]() Bilbao Metro Metro de Bilbao Bilboko metroa |
Locale | Bilbao | ![]() ![]() ![]() |
![]() ![]() ![]() |
![]() |
||
Began operation | 11 November 1995 | ||||||
Lines in operation | 2[x] | ||||||
No. of stations | 48 | ||||||
Network length | 51.0 km (31.7 mi) | ||||||
Ridership | 92.3 million (2023) | ||||||
![]() Madrid Metro Metro de Madrid |
Locale | Madrid | ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() |
![]() ![]() |
![]() |
|
Began operation | 30 December 1924 | ||||||
Lines in operation | 12 | ||||||
No. of stations | 242 | ||||||
Network length | 288.5 km (179.3 mi) | ||||||
Ridership | 662 million (2023) | ||||||
![]() Palma Metro Metro de Palma |
Locale | Palma de Mallorca | ![]() ![]() |
![]() |
|||
Began operation | 25 April 2007 | ||||||
Lines in operation | 2 | ||||||
No. of stations | 16 | ||||||
Network length | 15.6 km (9.7 mi) | ||||||
Ridership | 2.4 million (2016) | ||||||
![]() Malaga Metro[y] Metro de Málaga |
Locale | Malaga | ![]() ![]() |
![]() |
![]() |
![]() |
|
Began operation | 30 July 2014 | ||||||
Lines in operation | 2 | ||||||
No. of stations | 12 | ||||||
Network length | 8.5 km (5.3 mi) | ||||||
Ridership | 13 million (2023)[z] | ||||||
![]() Seville Metro Metro de Sevilla |
Locale | Seville | ![]() |
![]() ![]() ![]() |
![]() |
||
Began operation | 2 April 2009 | ||||||
Lines in operation | 1 | ||||||
No. of stations | 22 | ||||||
Network length | 18.0 km (11.2 mi) | ||||||
Ridership | 20.4 million (2023) | ||||||
![]() Metrovalencia[aa] |
Locale | Valencia | ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
|||
Began operation | 8 October 1988 | ||||||
Lines in operation | 3[ab] | ||||||
No. of stations | 97 | ||||||
Network length | 138 km (85.7 mi) | ||||||
Ridership | 90.4 million (2023)[ac] | ||||||
Sweden
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Stockholm Metro Stockholms tunnelbana |
Locale | Stockholm | ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
|
Began operation | 1 October 1950 | ||||||
Lines in operation | 3[ad] | ||||||
No. of stations | 100 | ||||||
Network length | 105.7 km (65.7 mi) | ||||||
Ridership | 355 million (2018) | ||||||
Switzerland
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Lausanne Métro Métro de Lausanne |
Locale | Lausanne | ![]() ![]() |
![]() |
![]() |
||
Began operation | 24 May 1991 | ||||||
Lines in operation | 2 | ||||||
No. of stations | 28 | ||||||
Network length | 13.7 km (8.5 mi) | ||||||
Ridership | 45.4 million (2013) | ||||||
Turkey
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Istanbul Metro[ae] İstanbul Metrosu |
Locale | Istanbul | ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
|
Began operation | 3 September 1989 | ||||||
Lines in operation | 11 | ||||||
No. of stations | 137 | ||||||
Network length | 243.3 km (151.2 mi) | ||||||
Ridership | 542.5 million (2022) | ||||||
Ukraine
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Dnipro Metro Дніпровський Mетрополітен |
Locale | Dnipro | 1 | 1 East extension | 1 East & West extensions | ![]() |
|
Began operation | 29 December 1995 | ||||||
Lines in operation | 1 | ||||||
No. of stations | 6 | ||||||
Network length | 7.8 km (4.8 mi) | ||||||
Ridership | 3.6 million (2020) | ||||||
![]() Kharkiv Metro Харківський Mетрополітен |
Locale | Kharkiv | ![]() ![]() ![]() |
![]() |
![]() ![]() ![]() |
![]() |
|
Began operation | 23 August 1975 | ||||||
Lines in operation | 3 | ||||||
No. of stations | 30 | ||||||
Network length | 38.1 km (23.7 mi) | ||||||
Ridership | 128.1 million (2020) | ||||||
![]() Kyiv Metro Київський Mетрополітен |
Locale | Kyiv | ![]() ![]() ![]() |
![]() |
![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
|
Began operation | 6 November 1960 | ||||||
Lines in operation | 3 | ||||||
No. of stations | 52 | ||||||
Network length | 67.6 km (42.0 mi) | ||||||
Ridership | 279.5 million (2020) | ||||||
![]() Kryvyi Rih Metro[af] Криворізьке Mетро |
Locale | Kryvyi Rih | ![]() ![]() ![]() |
![]() |
|||
Began operation | 26 December 1986 | ||||||
Lines in operation | 1[ag] | ||||||
No. of stations | 9 | ||||||
Network length | 14.7 km (9.1 mi) | ||||||
Ridership | 15.8 million (2009)[ah] | ||||||
United Kingdom
System | Information | Currently operational | Currently under construction | Currently planned | Map | Ref. | |
---|---|---|---|---|---|---|---|
![]() Glasgow Subway |
Locale | Glasgow | ![]() |
![]() |
|||
Began operation | 14 December 1896 | ||||||
Lines in operation | 1 | ||||||
No. of stations | 15 | ||||||
Network length | 10.5 km (6.5 mi) | ||||||
Ridership | 8 million (2021) | ||||||
![]() Docklands Light Railway |
Locale | London | ![]() |
![]() |
![]() |
||
Began operation | 31 August 1987 | ||||||
Lines in operation | 3[ai] | ||||||
No. of stations | 45 | ||||||
Network length | 38.0 km (23.6 mi) | ||||||
Ridership | 39.9 million (2020) | ||||||
![]() London Underground |
Locale | London | ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
||
Began operation | 10 January 1863[aj] | ||||||
Lines in operation | 11 | ||||||
No. of stations | 272 | ||||||
Network length | 402.0 km (249.8 mi) | ||||||
Ridership | 296 million (2021) | ||||||
![]() Tyne and Wear Metro |
Locale | Newcastle/Sunderland | Green Yellow | ![]() |
|||
Began operation | 11 August 1980 | ||||||
Lines in operation | 2 | ||||||
No. of stations | 60 | ||||||
Network length | 77.5 km (48.2 mi) | ||||||
Ridership | 24.3 million (2021) | ||||||
See also
Notes
- ^ Parts of the system opened in 1898 as part of the Vienna Stadtbahn
- ^ 4 services
- ^ the system is part-metro part-tramway. Only the metro sections are listed here
- ^ 4 services
- ^ 4 services
- ^ 2 routes
- ^ 16 routes
- ^ 9 services
- ^ 9 services
- ^ 4 services
- ^ 8 services
- ^ 3 services
- ^ Line 1 opened as a railway line in 1869
- ^ Another 4 stations are served via through operations of Line 3 on Proastiakos tracks to the Athens Airport
- ^ Another 20.7km is served via through operations of Line 3 on Proastiakos tracks to the Athens Airport
- ^ 5 services
- ^ 5 services
- ^ 5 services
- ^ The Porto Metro is actually a light rail system. Only grade-separated metro-like sections are listed here
- ^ 6 routes, all of which use a part of the grade-separated section
- ^ Figures account for the full system
- ^ 5 routes
- ^ 12 routes
- ^ 3 routes
- ^ Part of the system functions as at-grade light rail. Only underground sections are taken into account here
- ^ The figures are for the whole system, including the at-grade section
- ^ The system is a mix of light rail, tram and regional train. Only the underground rapid transit sections are listed here.
- ^ 6 out of 12 routes use the underground sections
- ^ Ridership figures refer to the whole system
- ^ 7 routes
- ^ Parts of the system are located in Asia
- ^ The system is part metro-part tram. Only the metro section is listed here.
- ^ 3 routes, all of which use the metro section
- ^ figures account for the whole system
- ^ 6 routes
- ^ Electrified in 1890
References
- ^ "World Metro Map by Mark Ovenden". 5 December 2007. Retrieved 31 May 2025.
- ^ https://www.wienerlinien.at/u2xu5