Line 2 (Dongguan Rail Transit)
Line 2 | |
---|---|
![]() | |
Overview | |
Other name(s) | R2 |
Status | In operation |
Locale | Dongguan, China |
Termini | |
Stations | 15 (in operation) |
Service | |
Type | Rapid transit |
System | Dongguan Rail Transit |
Operator(s) | Dongguan Rail Transit Corporation, Limited |
Rolling stock | 6-car Type B by CRRC Nanjing Puzhen[1] & Bombardier Transportation |
History | |
Opened | 27 May 2016 |
Technical | |
Line length | 37.7 km (23.43 mi) |
Number of tracks | 2 |
Character | Underground and elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 120 km/h designed, operating maximum 110km/h |
Line 2 of the Dongguan Rail Transit (Chinese: 东莞轨道交通2号线; pinyin: Dōngguǎn Guǐdào Jiāotōng Èr Hào Xiàn) is a rapid transit line in Dongguan. The line currently has 15 stations, 14 underground and 1 elevated, and is 37.743 kilometres (23.452 mi) long, from Dongguan railway station to Humen railway station. It opened on 27 May 2016. Construction of Line 2 began on 26 March 2010.[2][3]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Humen Railway Station — Dongguan Railway Station | 27 May 2016 | 37.7 km (23.43 mi) | 15 | Phase 1 & 2 |
Stations

Station No. |
Station name | Connections | Nearby bus stops | Distance km |
Location | ||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
215 | Humen Railway Station | 虎门火车站 | ![]() |
|
0.00 | 0.00 | Humen |
214 | Exhibition Center | 展览中心 |
L1 Houjie 6 (厚街6) 801 802 806 808 841 |
1.94 | 1.94 | Houjie | |
213 | Shanmei | 珊美 |
L1 Shatian 1 (沙田1) Houjie 3 (厚街3) Houjie 7 (厚街7) Houjie 21 (厚街21) 801 802 806 808 825 841 |
3.19 | 5.13 | ||
212 | Liaoxia | 寮厦 |
L1 Houjie 1 (厚街1) Houjie 17 (厚街17) Houjie 20 (厚街20) 802 808 831 841 856 |
3.26 | 8.39 | ||
211 | Chenwu | 陈屋 |
L1 Houjie 13 (厚街13) Houjie 15 (厚街15) Houjie 16 (厚街16) 802 831 841 |
2.22 | 10.61 | ||
210 | Gedi | 蛤地 |
Express 1 (公交快线1) 34 X12 |
1.61 | 12.22 | Nancheng | |
209 | Xiping | 西平 | ![]() |
850 |
1.61 | 13.83 | |
208 | Hongfu Road | 鸿福路 | 1 |
C2 C4 X5 9 X11 X13 14 19 27 36 41 46 328 862 |
1.46 | 15.29 | |
207 | Qifeng Park | 旗峰公园 |
1 K1 LG1 K4 X6 14 18 23 27 37 52 56 X11 |
2.35 | 17.64 | Dongcheng | |
206 | Dongcheng | 东城 |
4 K4 14 17 27 45 47 56 |
2.33 | 19.97 | ||
205 | Tianbao | 天宝 |
K4 5 K6 Gaoshe 9 (高涉9) 13 14 X16 X23 27 49 50 51 |
4.82 | 24.79 | Guancheng | |
204 | Xiaqiao | 下桥 |
L2 C3 K3 K4 Gaoshe 9 (高涉9) X9 X18 19 24 25 32 33 858 |
1.93 | 26.72 | Dongcheng | |
203 | Liuhua Park | 榴花公园 |
K3 Gaoshe 9 (高涉9) 13 19 24 25 47 55 821 822 829 852 |
2.39 | 29.11 | ||
202 | Chashan | 茶山 |
Chashan 1 (茶山1) Chashan 3 (茶山3) A5 A9 859 861 |
2.73 | 31.84 | Chashan | |
201 | Dongguan Railway Station | 东莞火车站 | GS ![]() |
Chashan 1 (茶山1) Shilong 1 (石龙1) Chashan 2 (茶山2) Shilong 2 (石龙2) Chashan 3 (茶山3) Shilong 3 (石龙3) Chashan 4 (茶山4) Shilong 4 (石龙4) A5 Shilong 5 (石龙5) Chashan 6 (茶山6) Shilong 7 (石龙7) Shilong 8 (石龙8) A9 X18 47 805 805A 807 809 813 821 826 828 829 852 859 861 |
5.21 | 37.05 | Shilong |
Future Development
Phase 3
Phase 3 of Line 2 is 17.1 km in length with 9 stations. Construction started in August 2022. It is expected to open in 2027.[4]
Station list[4]
- Humen North (虎门北)
- Humen Avenue (虎门大道)
- Humen Jinjie Road (虎门金捷路)
- Humen Guangming Road (虎门光明路)
- Binhaiwan (滨海湾)
- Qingchuangcheng (青创城)
- Gang'ao Ferry Terminal (港澳码头)
- Jiaoyiwan West (交椅湾西)
- Jiaoyiwan (交椅湾) (interchange with the Northern extension of Shenzhen Metro Line 20 in long-term planning)
See also
- Guangzhou Metro
- FMetro
- Shenzhen Metro
- List of rapid transit systems
- Metro systems by annual passenger rides
References
- ^ "2号线_运营线路".
- ^ "R2线2011年5月份工程进展". Dongguan Rail Transit. 2011-06-01. Archived from the original on 2012-03-30. Retrieved 2011-08-14.
- ^ "东莞首条地铁试运行". 东莞阳光网. 2015-12-29. Retrieved 2015-12-30.
- ^ a b "东莞轨道交通2号线三期动工 全长约17.1公里".
External links
- Dongguan Rail Transit – official website (in Chinese)