K27/28 Beijing-Dandong-Pyongyang through train

K27/28 Beijing-Dandong-Pyongyang through train
Overview
StatusChinese section only
Current operator(s)CR Beijing
KSR Pyongyang
Route
TerminiBeijing
Pyongyang
StopsShenyang, Dandong, Sinuiju Youth
Train number(s)K27/28
On-board services
Class(es)Soft sleeper
Hard sleeper
Hard seat (Chinese section only)
Seating arrangementsYes (Chinese section only)
Sleeping arrangementsYes
Catering facilitiesYes (Chinese section only)
Baggage facilitiesYes (Chinese section only)
Technical
Rolling stockCR Type 25G (Chinese section)
CR Type 25T (International section)
KSR Type 30
Track gauge1,435 mm (4 ft 8+12 in)
Electrification25kv 50HZ(Beijing-Shenyang)

China Railways K27/28 is an international train running between Beijing and Pyongyang. It commenced operations on the 21 May 1954. The train is numbered differently depending on the section of its journey. The cross-border section is numbered 95/85 and the Sinuiju–Pyongyang section 51/52. The train, operated by China Railway, departs Beijing on Mondays and Thursdays, taking about 24 hours to arrive, and returns from Pyongyang every Wednesday and Saturday, taking about 23 hours. Since 10 October 1983, the Korean State Railway also contributes trains to this service, departing every Monday and Thursday from Pyongyang, and returning from Beijing every Wednesday and Saturday.[1]

History

On 16 December 1953, China and North Korea agreed to commence operations of a through train service between Beijing and Pyongyang from June 1954, with China Railway as the operator.[2]: 5  The agreement came into effect on 1 April 1954, when the Korean State Railway began international train operations.[2]: 6  The direct express train 13/14 between Beijing and Dandong commenced operations on 21 May 1954, with services operated by China Railway. On 3 June, train 13/14 carried 2 soft sleepers and a hard seat-luggage coach to Pyongyang for the first time, marking the beginning of the Beijing–Pyongyang international train. [2]: 6 

On 1 February 1955, a resolution adopted between China and Soviet Union regarding the Moscow–Pyongyang through train service agreed that the coaches would be attached to train number 13/14 at Shenyang.[2]: 8 

The coaches were changed to hard and a soft sleeper coach in 1957.

On 11 June 1959, a mass reschedule by the Chinese Railway Ministry renumbered the train to 27/28.

The Chinese border station was renamed to Dandong in 1965.[2]: 48 

By an agreement between China and North Korea, all train crew are issued a 3-month approval instead of a single journey approval.[2]: 56 

27/28 was elevated to general fast train in 1981.

By an agreement in 1982, the Beijing–Pyongyang through train services would be jointly operated with the Korean State Railway.[2]: 81  The first service by KSR commenced on 10 October 1983, since then the train service has been rotated between CR and KSR.[2]: 84 

In 1985, the train was rescheduled from twice weekly to four times a wee, with both operators running two trains.

In 1991, it became obligatory to report if the train was delayed or additional coaches were carried.[2]: 117 

During the third acceleration campaign, in 2000, 27/28 was elevated to a fast train, as K27/28.[3]

During the fifth acceleration campaign, in 2004, K27/28 was rerouted on the Shanhaiguan–Shenyang section. It returned to the original route during the sixth acceleration campaign in 2007.

From 2008 on, the Type 25G air-conditioned and German-made type 18 coaches were replaced with type 25T coaches, with the Korean coaches being replaced from October 2012. KSR type 31 (25K) coaches were replaced by type 30 (25G) coaches.

From 16 November 2014, CR changed the domestic coaches to Type 25G, the international coaches remain unchanged. The replaced Type 25T coaches are reserved in depot and serve as backup.

Due to COVID 19, the Dandong–Pyongyang section of K27/28 is suspended, while the Chinese section remains in operation.[4]

Coaches

KSR Standard Sleeper coach
Train at Dandong

The trains are operated by China Railway type 25G coaches, usually as a 16-coach train between Beijing and Dandong, with 9 hard sleepers, 4 hard seating, and one soft sleeper, canteen and luggage coach each, operating daily. The international coaches are two type 25T coaches attached to the train, one hard sleeper and one soft sleeper. Trains operated KSR attach two Type 30 hard sleeper coaches (Korean:일반침대30, lit. "standard sleeper"). These coaches are coupled to the Dandong–Pyongyang through train at Dandong station.[5]

K27 used to attach two coaches from the Moscow–Pyongyang train at Shenyang station, which were also decoupled at the same station on the return trip. Due to technical issues and low ridership, by agreement between RZD, CR and KSR the coaches for Pyongyang are no longer be attached to the Vostok train and then to the train from Beijing and instead are carried by the train to Vladivostok, with the coaches operated by KSR. [2]: 167 [6]

Attendants of K27/28 are provided by CR Beijing and KSR Pyongyang depending on the train operator.

Section Beijing↔Dandong Beijing↔Pyongyang
Coach no. 1 2-10 11 12 13-16 13 12
Coach XL25G

Luggage
YW25G

Hard sleeper
RW25G

Soft sleeper
CA25G

Canteen
YZ25G

Hard seat
YW25T/KSR Type 30 (일반침대30)

Hard sleeper/Standard sleeper
RW25T/KSR Type 30 (일반침대30)

Soft sleeper/Standard sleeper
Operator CR Beijing CR Beijing / KSR Pyongyang

Locomotives used

Chinese section

CR Shenyang HXD3D "Communist" hauling K27
CR Shenyang HXD3D "Communist" hauling K28

K27/28 is hauled by a CR Shenyang HXD3D from Beijing to Shenyang, and DF11G from Shenyang to Dandong.

At the border the train is hauled by CR Shenyang or KSR DF5 (Korean:내연100) for the cross border section, then a DF4 or DF4B (Korean:내연200) from KSR is used to haul the train to Pyongyang.

Section Beijing ↔ Shenyang Shenyang ↔ Dandong Dandong ↔ Sinuiju Sinuiju ↔ Pyongyang
Loco

Operator

Shift
HXD3D

CR Shenyang

Shenyang driver
DF11G

CR Shenyang

Shenyang driver
DF5

CR Shenyang/KSR

Dandong driver/KSR driver
DF4/DF4B

KSR

KSR driver

Schedule

Chinese section

  • From 10 April 2025
K27 Stops K28
Train no. Distance Day Arrival Departure Departure Arrival Day Distance Train no.
K27 0 Day 1 Departure 17:17 Beijing 08:40 Arrival Day 2 1090 K28
K27 16 17:37 17:42 Beijing Fengtai K28
K27 Guangyang 07:39 07:42 Day 2 1016 K28
K27 137 Day 1 19:03 19:09 Tianjin 06:49 06:55 953 K28
K27 260 20:30 20:32 Tangshan 05:21 05:23 830 K28
K27 433 22:36 22:42 Shanhaiguan 02:58 03:04 657 K28
K27 821 Day 2 03:20 03:40 Shenyang 22:07 22:24 Day 1 269 K28
K27 897 04:46 04:52 Benxi 20:58 21:01 193 K28
K27 1030 06:38 06:41 Fenghuangcheng 19:11 19:13 60 K28
K27 1090 07:35 Arrival Dandong Departure 18:18 0 K28

Dandong–Pyongyang section

  • 1 hour diffrence between two countries
95/52 Stop 85/51
Train no. Day Arrival Departure Arrival Departure Day Train no.
95 Day 2 Departure 10:00 Dandong 16:23 Arrival Day 1 85
 ChinaBeijing Time UTC+08:00) /  North KoreaPyongyang Time UTC+09:00)
95/52 Day 2 11:10 13:09 Sinuiju Youth 15:32 17:13 Day 1 51/85
52 14:12 14:29 Tongrim 14:27 14:31 51
52 15:43 15:53 Chongju Youth 13:11 13:17 51
52 18:45 Arrival Pyongyang Departure 10:25 51

See also

References

  1. ^ 东港市人民政府携手华铁传媒在京启动东港专列 Archived 2011-03-07 at the Wayback Machine. 华讯财经. 2010年12月23日.
  2. ^ a b c d e f g h i j 王馨源 (2002年). 《中国铁路国际联运大事记》. 中国铁道出版社.
  3. ^ 快速列车新旧车次对照表<一> Archived 2011-02-11 at the Wayback Machine. 搜狐. 2000年11月6日.
  4. ^ 中国与朝鲜、哈萨克斯坦间旅客列车暂停运营. 人民网-社会频道. 2020-01-30. Archived from the original on 2020-01-30. Retrieved 2020-01-30.
  5. ^ 北京到平壤国际列车车次及票价详情 Archived 2012-07-18 at archive.today. inSing.cn. 2011年5月5日.
  6. ^ K20/19次国际列车中取消俄朝联运车厢 Archived 2013-11-03 at the Wayback Machine. 内蒙古满洲里市人民政府. 2011年3月18日.