China Railway CR300AF

China Railway CR300AF
CR300AF-0003 at Beijing National Railway Test Centre (July 2019)
In service
  • 25 December 2020 (2020-12-25)
ManufacturerCRRC Qingdao Sifang
Bombardier Transportation
CRRC Nanjing Puzhen
ReplacedCRH1, CRH2, CRH5
Formation8 cars (4M4T)
Capacity613 (48 first class / 565 second class)
598 (5 business / 28 first class / 565 second class) for AF-1005~1009
OperatorsChina China Railway
Specifications
Train lengthapprox. 209 m (686 ft)
Maximum speed
  • Service:
  • 250 km/h (160 mph)
  • Design:
  • 300 km/h (190 mph)
Traction systemWater cooling IGBT-VVVF inverter control (Zhuzhou CRRC Times Electric)
Traction motorsCRRC Zhuzhou Electric squirrel-cage three-phase AC motor
Electric system(s)25 kV 50 Hz AC Overhead catenary
Current collectionPantograph
BogiesBolsterless air spring bogies
Braking system(s)Regenerative braking, direct electro-pneumatic braking
Track gauge1,435 mm (4 ft 8+12 in) standard gauge


The CR300AF Fuxing is one of the Fuxing electric multiple unit developed for China Railway High-speed network.[1] It was ordered by China Railway from CRRC Qingdao Sifang.

Development

The CR300 series Fuxing Hao EMUs (250 km/h class) are the third class of Fuxing Hao EMUs, following the CR400 series (350 km/h class) and CR200J series (160 km/h class).

In early 2018, design reviews for the CR300 series Fuxing Hao EMUs began.[2] By the end of September 2018, the CR300AF-0001 prototype was manufactured and rolled off the production line. On October 17, the 0001 prototype was transferred without power to the Beijing National Railway Test Centre for testing. On December 7, unit 0001 was transferred to Chengdu railway station. On December 13, unit 0001 began test runs on the Chengdu–Guiyang High-Speed Railway section between Leshan railway station and Xingwen railway station, which was undergoing joint commissioning and testing.

On November 14, 2019, the National Railway Administration approved CRRC Sifang for mass production of the CR300AF type EMU.

On March 10, 2020, the National Railway Administration also officially approved CRRC Nanjing Puzhen for mass production of the CR300AF type EMU, marking the first time the company obtained qualification to produce high-speed trains.[3]

On November 24, 2020, China Railway Nanning Group announced that 5 CR300AF units arriving by year-end would assist with the 2021 Spring Festival travel season.[4]

On December 25, 2020, the CR300AF began passenger operations, with the inaugural train departing from Kunming South railway station via the Kunming–Chuxiong–Dali railway to Dali railway station.[5]

On April 30, 2021, the CR300AF began operating on the Hainan Ring High-Speed Railway.[6]

Design

Carbody

The CR300AF's front end, temporarily featuring a red stripe livery similar to the CR400AF.

The CR300AF features a new front end design, with a shorter nose compared to the CR400AF. As it does not include business class seating, the two auxiliary windows on the front of the CR400AF's driver's cab have been removed, and the side windows have been raised and changed from narrow trapezoidal windows to rhomboid windows.

In terms of livery, the production CR300AF, like the CR300BF, uses sky blue as its base color. Unlike the CR300BF, which is nicknamed "Blue Warm Man", the CR300AF's appearance, resembling a cool and elegant beauty, has earned it the nickname "Blue Sister" among railway enthusiasts.[7] The red stripe on the front and sides of the leading car and the black window livery design are consistent with the CR400AF. During factory testing, the prototype CR300AF temporarily used a silver-grey base color similar to the CR400AF, and the red stripe design on the side of the leading car also differed from the production livery.

Power configuration

The CR300AF adopts an 8-car formation with a 4M4T (4 motor cars, 4 trailer cars) power configuration, consisting of two basic power units. Cars 02, 04, 05, and 07 are motor cars, while cars 01, 03, 06, and 08 are trailer cars.

Key equipment

Traction system

The traction motors and traction inverters of the CR300AF are manufactured by CRRC Zhuzhou Electric and CRRC Times Electric respectively. The rectification and inversion stages utilize a high-power IGBT-based AC-DC-AC traction system. By increasing the intermediate DC link voltage, efficiency is improved, losses are reduced, motor control characteristics are enhanced, and traction output power per unit mass is increased. The system fully utilizes component performance to significantly increase electric braking power based on traction power. Phase-shifting technology is used to effectively control harmonics, ensure the quality of regenerative energy recovery, and reduce overall energy consumption.

The CR300AF produces less magnetic excitation noise during acceleration and braking compared to the CRH2 series EMUs. Its magnetic excitation noise is closer to previous Times Electric products, rather than the distinct low-pitched magnetic noise emitted by older Hitachi VVVF systems.

Pantograph and power supply system

The CR300AF is equipped with pantographs on cars 3 and 6. One pantograph is used during normal operation, while two are used for multiple-unit operation.

Interior

The CR300AF trainset comprises one first-class car and seven second-class cars, with a total capacity of 613 passengers. Compared to the Harmony series EMUs, the seat pitch is more spacious. The entire train is equipped with Wi-Fi antennas, providing wireless internet service, and features accessible restrooms, USB power outlets, large luggage racks, luggage rack indicator lights, and washroom shelves. Compared to the CR400AF, the second-class seat fabric has been changed from beige stripes to blue geometric patterns. The train also includes a seat information display system, indicating seat numbers and reservation status.[8][9]

Additionally, for the CR300AF Hainan Eastern Ring customized version operating on the Hainan Eastern Ring High-Speed Railway since February 2021, the second-class car capacity remains the same as the production model. However, the first-class car (Car 01) has been converted into a combined first-class/business class car, similar to those on the CR400AF and CR400BF. The capacity of Car 01 has been adjusted from the original 48 seats to 33 seats (5 business class + 28 first class), reducing the total train capacity from 613 to 598 passengers.[10]

Allocation

As of January 2021, 64 CR300AF Fuxing Hao EMUs have been delivered.

  • Units 0001, 0003, 6005 are prototypes.
  • Units 1xxx are manufactured by Bombardier Sifang (Qingdao) Transportation.
  • Units 2xxx are manufactured by CRRC Qingdao Sifang.
  • Units 6xxx are manufactured by CRRC Nanjing Puzhen.
Allocation Quantity Unit numbers Depot Notes
CR300AF
Guangzhou Railway Group 6 0003, 1001–1004, 1010–1013 Shenzhen 0003 is a prototype.
5 1005–1009 Sanya For this batch, car 01 is a combined first-class/business class car, with a total capacity of 598 passengers, including business class seats.
Jinan Railway Group 11 2001–2005, 2031–2036 Qingdao North
6 2037–2042 Jinan East
Chengdu Railway Group 21 2006–2020, 2028–2030, 2045–2047 Guiyang North
Kunming Railway Group 10 0001, 2021–2027, 2043, 2044 Kunming South
Nanning Railway Group 5 6001–6005 Nanning Tunli 6005 is a prototype, originally numbered 0004.

Formation

Carriage types
  • ZYS: First Class / Business Class Coach
  • ZY: First Class Coach
  • ZE: Second Class Coach
  • ZEC: Second Class Coach / Dining Car
Meaning of abbreviations
  • Z: Zuo (Pinyin), 座, seat, coach
  • Y: Yi (Pinyin), 一, one, first class
  • E: Er (Pinyin), 二, two, second class
  • C / CA: Can (Pinyin), 餐, dining, dining car
  • S / SW: Shang (Pinyin), 商, business, business class

CR300AF

Car No. 1 2 3 4 5 6 7 8
Carriage type First Class Car Second Class Car Second Class Car/Dining Car Second Class Car
Carriage type (1005~1009) First Class/Business Class Car
Car number CR300AF-xxxx
ZY xxxx01
ZE xxxx02 ZE xxxx03 ZE xxxx04 ZEC xxxx05 ZE xxxx06 ZE xxxx07 CR300AF-xxxx
ZE xxxx00
Car number (1005~1009) CR300AF-xxxx
ZYS xxxx01
Capacity 48 90 90 77 63 90 90 65
Capacity (1005~1009) 5+28
Power configuration Trailer car
with cab (Tc)
Motor car (M) Trailer car, with pantograph (Tp) Motor car (M) Motor car (M) Trailer car, with pantograph (Tp) Motor car (M) Trailer car
with cab (Tc)
Power unit Unit 1 Unit 2
  • xxxx: Trainset number.
  • Units 1005-1009 are customized versions for the Hainan Eastern Ring High-Speed Railway. Car 1, originally a first-class car in the production model, was changed to a combined first-class/business class car, and the total trainset capacity was adjusted from 613 to 598 passengers.

Export

On October 28, 2020, the State Railway of Thailand signed a contract with China Railway for the China-Thailand railway, which includes the procurement of 6 CR300AF EMUs.[11] This marks the first export of the CR300AF.

Incidents

  • On October 14, 2018, during the non-powered transfer of the newly manufactured CR300AF-0001 unit via the Beijing–Shanghai railway to the Beijing National Railway Test Centre, the protective cover of the high-voltage electrical compartment on the roof of car 6 lifted upwards while the train was still in Jinan territory and continued for nearly 500 kilometers into Beijing. This caused a trip of the overhead catenary system in the section between Beijing South railway station and Beijing railway station within the Beijing railway hub, leading to widespread delays for trains on the northbound Beijing–Shanghai railway.
  • On November 7, 2020, CR300AF-0004 (a leading car) collided with a bus waiting at a red light during road transport outside the CRRC Nanjing Puzhen factory. According to an official announcement, at approximately 17:35 on November 7, a Line 503 bus of Nanjing Yangzi Bus Company's Liuhe Automobile Team was traveling northbound on the Purang Residential Area section. While the bus was stopped in the rightmost lane at a red light, a semi-trailer carrying the front section of a Fuxing Hao CR300AF EMU, approximately 30 meters long, made a left turn from the middle straight lane and struck the bus window, damaging the second side window on the left. As the bus was operating normally at the time of the incident, the semi-trailer carrying the Fuxing Hao was deemed fully responsible, and its driver compensated for the cost of repairing the glass. No injuries were reported at the scene.[12]

See also

References

  1. ^ Xinhua News Agency (2017-06-27). ""复兴号"来了 中国标准动车组时代来了". Southern News Network (in Chinese). Guangzhou. Archived from the original on 2017-09-01. Retrieved 2017-06-29. "'复兴号'是基于中国自主研发的高速动车组设计制造平台,是中国具有完全知识产权的新一代高速列车。"中国铁路总公司总经理陆东福说。
  2. ^ Hui Gaotiezu. "Analysis and Outlook on the Unified Replacement of Xicheng High-Speed Rail Trains with 380 Series and Subsequent CR300 Trains" (in Chinese). Archived from the original on 2018-10-28. Retrieved 2018-10-17.
  3. ^ "Puzhen Company Successfully Obtains CR300AF EMU Manufacturing License" (in Chinese). Archived from the original on 2020-11-05. Retrieved 2020-03-30.
  4. ^ "Important preview! Guangxi's Fuxing Hao is about to go online, becoming more advanced" (in Chinese). Archived from the original on 2021-01-24. Retrieved 2020-11-24.
  5. ^ "New 250km/h "Fuxing Hao" EMU put into operation for the first time in Southwest China" (in Chinese). The Paper. 2020-12-29. Archived from the original on 2021-01-24.
  6. ^ "CR300AF Fuxing Hao EMU lands on Hainan Island" (in Chinese). Hainan Daily. 2021-02-01.
  7. ^ "The "Blue" family has started running in many places, how special is it?". CCTV News Client (in Chinese). 2021-02-01. Archived from the original on 2023-11-09. Retrieved 2023-11-09 – via CCTV.com.
  8. ^ "New Fuxing Hao EMU to be put into use: WiFi full coverage, with USB power outlets". IT Home (in Chinese). 2020-12-23. Archived from the original on 2020-12-23. Retrieved 2021-03-22.
  9. ^ "CR300AF Fuxing Hao EMU lands on Hainan Island". Hainan Provincial Government Website (in Chinese). 2021-02-01. Retrieved 2021-03-22.
  10. ^ "Zou Yong: "Blue Warm Man" EMU will take you to experience a different "style" on "Coconut Island"". China Rule of Law (in Chinese). 2021-02-05. Archived from the original on 2021-04-19. Retrieved 2021-02-05.
  11. ^ "China and Thailand sign new contract for Phase I of China-Thailand Railway Cooperation Project" (in Chinese). Archived from the original on 2021-02-01. Retrieved 2020-10-29.
  12. ^ ""Fuxing Hao" hit a bus? This is what happened..." Information Times (in Chinese). 2020-11-08. Archived from the original on 2021-01-24. Retrieved 2020-11-08.