Kawasaki Heavy Industries C151

Kawasaki Heavy Industries (KHI) C151
A Kawasaki C151 train before refurbishment
A refurbished Kawasaki C151 train
Interior of a Kawasaki C151 before refurbishment
Interior of a refurbished Kawasaki C151
Stock typeElectric multiple unit
In service7 November 1987 (1987-11-07)
ManufacturerKawasaki (with Nippon Sharyo, Ltd., Tokyu Car Corporation, and Kinki Sharyo Co., Ltd.)[1]
Built atKobe, Japan[2]
Constructed1986–1989
Entered service7 November 1987 (1987-11-07)
RefurbishedHyundai Rotem (with Mitsui)[3]
2004–2008
RetiredSeptember 2025 (2025-09)
ScrappedJune 2020–onwards [4]
Number built396 vehicles (66 sets) + 2 extra driving trailers for the money train
Number in service66 vehicles (11 sets) [5]
Number retired270 vehicles (45 sets) + 2 extra driving trailers for the money train
Number preserved8 vehicles
Number scrapped262 vehicles
SuccessorAlstom Movia R151
Formation6 cars per trainset
DT–M1–M2+M2–M1–DT
Fleet numbers
  • 001/002 – 131/132 (regular six-car trainsets)
  • 301 & 302 (cash trainset)
Capacity1920 passengers
  • 372 seats (as built)
  • 296 seats (first refurbishment)
  • 212 seats (middle seats removed)
  • 208 seats (CBTC installation)
OperatorsSMRT Trains Ltd (SMRT Corporation)
Depots
Lines served
Specifications
Car body constructionAluminium-alloy double-skinned construction[2]
Train length138.5 m (454 ft 4+34 in)
Car length
  • 23.65 m (77 ft 7 in) (DT)
  • 22.8 m (74 ft 10 in) (M)
Width3.2 m (10 ft 6 in)
Height3.69 m (12 ft 1+14 in)
Doors1,450 mm (57+116 in), 8 per car
Wheel diameter850–775 mm (33.5–30.5 in) (new–worn)[6]
Wheelbase2,500 mm (98 in)[6]
Maximum speed
  • 90 km/h (56 mph) (design)
  • 80 km/h (50 mph) (service)
Weight
  • 21.7 t (21.4 long tons; 23.9 short tons) (DT)
  • 38.3 t (37.7 long tons; 42.2 short tons) (M1)
  • 38.4 t (37.8 long tons; 42.3 short tons) (M2)
Axle load16 t (16 long tons; 18 short tons)[6]
Traction system
Traction motors
Power outputAs built: 2.32 MW (3,111 hp)
TransmissionWestinghouse-Natal (WN) drive; gear ratio: 6.57 : 1 (92 / 14)
Acceleration1 m/s2 (2.2 mph/s)
Deceleration
  • 1 m/s2 (2.2 mph/s) (service)
  • 1.3 m/s2 (2.9 mph/s) (emergency)
Electric system(s)750 V DC third rail
Current collectionCollector shoe
UIC classification2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′
BogiesDuewag SF 2100[6][1][2]
Braking system(s)Westinghouse Brake & Signal electro-pneumatic, regenerative and rheostatic[2][8]
Safety system(s)
Coupling systemScharfenberg[1][2]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The Kawasaki Heavy Industries (KHI) C151 is the first generation electric multiple unit (EMU) rolling stock in operation on the North–South and East–West lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by a consortium led by Kawasaki Heavy Industries (KHI) under Contract 151. They were first introduced in 1987 and are the oldest trains in operation on the network.

Sixty-six trainsets consisting of six cars each and a single money train set consisting of four cars were contracted in 1984. They were manufactured from 1986 to 1989 in two batches by a Japanese consortium consisting of the namesake Kawasaki, Nippon Sharyo, Tokyu Car Corp, and Kinki Sharyo following a round of intense competitive bidding by international rolling stock manufacturers.

The trains underwent a two-year mid-life interior refurbishment programme by Hyundai Rotem. After the 2011 major train disruptions on 15 and 17 December 2011, further plans to upgrade its mechanical components to increase its reliability were made. The first two trainsets to receive this upgrade, which included a replacement traction system to PMSM, entered service in July 2015. In total, 6 trains were fitted with the PMSM system by Toshiba. The R151 trains have been replacing all of the first-generation C151 trains since June 2023, with the latter to be entirely superseded by end-September 2025.

Operational history

Tendering process

With construction of the Mass Rapid Transit system underway in 1983, Contract 151 called for the procurement of rolling stock – 150 cars in Phase I and an option for 246 cars in Phase II.[12] In what the Financial Times described as "a time when manufacturers were begging for orders" for the global rolling stock market,[13] competition for the contract was intense. At least eight companies from around the world submitted bids for what they had nicknamed the "Big One".[12] Bidders included Metro-Cammell with Singapore Automotive Engineering, Kawasaki with three Japanese manufacturers, MAN with AEG, Siemens and Brown, Boveri & Cie, Francorail with Alsthom-Alantique, SOFRETU and Singapore Shipbuilding and Engineering, ASEA with Sembawang Shipyard, and a Bombardier Transportation-led consortium with Hawker Siddeley Canada and Brown Boveri Canada.[14][15] Also during the bidding process, the Belgian BN-ACEC (makers of the light rail vehicle for Manila's system) and the Finnish Valmet and Strömberg submitted bids for the trains.[16][17]

Competition for the contract was so fierce that it involved last-minute discounts, offers of free parts, and allegations of sabotage.[1][12] Metro-Cammell, Kawasaki, and ASEA were shortlisted for the final round.[14][18][19] Metro-Cammell based its design on the Hong Kong MTR M-Train EMU and proposed to use the GEC Traction camshaft resistance control propulsion system had they won the contract.[1] Metro-Cammell also delivered a concept mock-up and was originally the favourite to win the contract.[12] However, analysts became concerned that a measuring error involving the London Underground 1983 Stock during the evaluation period could jeopardise their bid.[20][21]

On 12 April 1984, the Japanese consortium of Kawasaki with Nippon Sharyo, Tokyu Car Corp., and Kinki Sharyo was awarded Contract 151 at a cost of S$581.5 million for the construction of 396 passenger cars.[1][22][23] Kawasaki won the contract; its bid – aided by favourable financing from Mitsui and extremely positive economic conditions in Japan – was 12% lower than those of other bidders, and the 50% lower energy usage of the Mitsubishi GTO-Chopper traction motors in comparison to the GEC Traction camshaft resistance control motors then used on the MTR M-Train EMU was also a major factor in said consortium being awarded the contract.[13][24] The award was the largest single contract awarded in the initial construction of the system.[13] Kawasaki also promised to supply $20.9m worth of complimentary spare parts after delivery.[25] The loss of Contract 151 was a massive financial blow to Metro-Cammell, who were forced to reduce their workforce by half later that year.[26]

Initial construction

A mock-up was manufactured in Japan after Kawasaki won the contract.[27] It was shipped to Singapore and put on public display during the 1984 National Exhibition held in November at the World Trade Centre.[27] The mock-up featured three choices of seating arrangements and colour schemes; members of the public were invited to give feedback on these options.[27] The finalised interior design of the C151 trains consisted of a fully longitudinal seating arrangement.[28] The bucket seats were made of plastic; glass partitions separated the seating areas from the passenger doors.[28] Strap lines for standing passengers were installed in the middle of every car.[28] The colour scheme of each adjacent car's interior was distinct to make car identification in cases of fault reporting easier for passengers.[28] Originally the colour scheme of the driving trailer cars was orange, that of the second and fifth motor cars was blue, and that of the two centre motor cars was green.[2] There were also nine seats between two doors; this was reduced to seven after the first round of refurbishment.[28]

While the rolling stock and Mitsubishi Electric propulsion equipment were constructed in Japan, many parts were sourced from Europe. The trains were fitted with Stone Platt air-conditioning, Duewag bogies, Narita Mfg gangways and detrainment doors,[29] Scharfenberg couplers, and Westinghouse brakes.[1][2][30] The propulsion equipment used by Mitsubishi Electric was estimated to consume 50% less electricity than Hong Kong's existing MTR M-Train EMU.[2] Its Automatic Train Control (ATC) signalling system was supplied by Westinghouse, which was capable of running at pre-programmed speeds that was activated by the train driver.[31] While theoretically possible for it to be designed for a fully driverless operation using this signalling technology, the MRT Corporation (MRTC; now SMRT Corporation) decided against this option.[31] These trainsets were assembled in Kobe, Japan, and then shipped to Singapore by Neptune Orient Lines.[25] The first train set was delivered to the MRTC on 8 July 1986 at Bishan Depot, where it was officiated by Yeo Ning Hong.[2][32] The following year, the first stretch of the MRT network opened alongside the C151 train's debut.[33][34]

The C151 was also the basis for the Taipei Metro C301, built from 1992 to 1994 by the Kawasaki and Union Rail Car Partnership, for the Taipei Metro's Tamsui–Xinyi Line.[35] Between 1994 and 1996, original rail wheels of all 66 Kawasaki C151 trains were progressively replaced with German-made rail bogies equipped with absorbers that dampened vibrations on the wheels in motion. The replacements were made at a cost of $5.4 million, and were part of enhancement works in conjunction with the commencement of the Woodlands extension.[36]

First refurbishment

A Kawasaki builder's plate, Hyundai Rotem refurbishment plate and a car number label in a C151 train

On 3 September 2004, Hyundai Rotem, Mitsui, RM Transit Technology, and dU LexBuild received an order to refurbish all 396 carriages, costing S$142.7 million in total.[3] The works included the refurbishment of interior fixtures, the addition of wheelchair spaces, the upgrading of onboard communications equipment, enhancement of the public announcement system, and general improvement of the cars' appearance.[37] SMRT Corporation said the reasons for this refurbishment were due to wear and damage of important components over the past two decades, and water leaks from the air-conditioning systems on some trains.[37] The company chose this option instead of buying new rolling stock as it would have cost S$792 million.[37] The first refurbished train began revenue service on 5 November 2006, and all remaining trainsets had been refurbished by January 2009.[37]

The refurbished C151 trains used the SMRT's repainted "Blackbird" livery scheme from the C751B, which was also later adopted in the C151A rolling stock. The interior fittings were replaced with white interior walls along with new seats that were installed further back to allow for more standing space. The colour of the seats in the driving trailer were also changed from orange to red.[37] Seats of the refurbished train cars measured from 43 cm (16.9 in) to 48 cm (18.9 in). Four of seven seats per row were designated as priority seats, which were differentiated using a darker colour;[38] this practice of distinguishing priority seats with darker shades was also used on the Taipei Metro rolling stock in Taiwan.[39]

The Mitsubishi Electric propulsion system was retained, having performed better than expected.[37] The wheelchair space was made available at the end of two mid-train cars, nearest to the elevators in elevated stations. Each three LED lights (top) that blink to warn passengers of closing doors were also introduced in the upper middle section of the door.[37] Additional loud speakers and advertisement panels were added. Handgrips were moved to the support stanchion bars of the seats on the ceiling, and grab bars were located near the doors and at both ends of each car. The air-conditioning system was modified to match the system used in the C751B cars, with air-conditioning vents and in-flow fans installed.[37]

In November 2008, SMRT Corporation and the Land Transport Authority (LTA) announced that the last ten refurbished trainsets would have only one-third of their seats replaced with rails to create extra standing space.[40][41] This move was justified on grounds of allowing more standing space on board during peak-hour services.[40][41] The reduction of seats per row from nine to seven after refurbishment was already unpopular among commuters;[42] the decision to further reduce seating capacity drew sharp criticism against the operator and LTA. As of December 2015, all 66 C151s from one-third of their seats have been replaced by metal bars to create extra standing space.[43][44][45][46]

Second refurbishment and replacement

Following major train disruptions on 15 and 17 December 2011, a Committee of Inquiry (COI) found that despite the first refurbishment of the C151 rolling stock, "there does not appear to be any upgrade in terms of engineering components".[47] The COI was particularly critical of the inadequate and ageing emergency battery installed on the C151 and recommended the installation of a Train Integrated Management System (TIMS), found on the C751B and C151A trains.[47]

In response, SMRT announced it was replacing important engineering components on the oldest C151 and C651 trains.[48] This included changing the existing Mitsubishi Electric propulsion system with the newer insulated-gate bipolar transistor (IGBT) and Permanent Magnet Synchronous Motor (PMSM) propulsion system by Toshiba, technology which was also used in the Tokyo Metro's 1000 and 16000 series trains as well as the JR Kyushu's 305 series and the Hankyu 1000 series trains.[49] In July 2015, two trains were trialed with the new propulsion system on the Changi Airport Extension. The trial was successful and was ported to the C651 refurbishment from 2016 to 2018, while four other trains were rolled out with PMSM all the way till August 2017.[50][51][52] The replacement of traction motors into Toshiba PMSM was terminated prematurely by SMRT Corporation in September 2018 due to the New Rail Financing Framework (NRFF).[53][54][55] In tandem with the replacement of the signalling system on the East–West Line and North–South Line with the newer Thales SelTrac signalling system, new equipment was installed in the passenger compartment of the trailer cars.[11]

In January 2016, LTA had announced its intention to replace all trains with the new R151 trains.[56][57] On 13 April 2017, LTA released a tender for contract R151, which would be the replacement train for all of the oldest MRT trains.[58] On 25 July 2018, the contract R151 was awarded to Bombardier Transportation at a sum of $1.2 billion, inclusive of a long-term service support package for up to 30 years.[59] 106 R151 trains would subsequently replace all 66 C151 trains along with the 19 C651 and 21 C751B trains from 2023 onwards, while the C151 trains would be decommissioned.[60]

Withdrawal

The withdrawal of the C151 trains commenced on 22 June 2020. Initially projected to be completed by end-2026,[61] the trains were scheduled to be retired by the end of September 2025. The delivery of the new trains was previously delayed by the COVID-19 pandemic, which forced SMRT to extend the C151 trains' service.[62] Trains were scrapped locally at Toyotron Pte Ltd, which was done for the first 25 trains, and later at Beng Cheng Metal Pte Ltd for all subsequent trains. As of 18 August 2025, 46 of them have been scrapped or preserved, 9 trains are laid up awaiting scrapping, and only 11 trains remain in service.[63] Notable trains that were preserved include at SAFTI City Track 1, where it is used for training purposes by the Singapore Armed Forces,[64][65] and at Changi Exhibition Centre, where a train was used in the filming of Mediacorp drama series Third Rail (2022).[66]

Operational details

Livery

The cars had an aluminium-alloy double-skinned construction, and were delivered unpainted to save time.[28] A red adhesive strip ran through the length of the cars in the middle to match the operator's visual branding.[2][28] The unpainted cars had a shiny appearance upon delivery, but as dirt and grime accumulated it became a recurring problem for the operator and attracted several public complaints.[67] In response, the MRTC built a wash machine at Bishan Depot in an attempt to clean up the cars' exterior proper.[68] After refurbishment, the problem was solved by covering the cars' exterior entirely with giant stickers, creating a blackbird livery with a red band-colour running down the middle and a grey band-colour at the bottom that is similar to the newer generation C751B and C151A rolling stocks.[38]

Passenger announcement and information systems

The Kawasaki C151 sets originally had no visual passenger information system; station announcements had to be made by the train operator.[69] An automatic audio announcement system using voice synthesisers was installed on each train by September 1994.[69] The first iteration of the door closing buzzer announcements, which replaced the initial door chimes, was fully introduced by April 1997.[70] Kawasaki also built a specially modified DT trailer car to serve as a money train.[71][72]

SMRT first attempted to install a passenger information system, SMRTime, on trains using LCD displays in 1999; these have since been removed.[73] In 2008, 4 units of vacuum fluorescent display (VFD) were mounted on the ceiling and 8 units of dynamic route maps were mounted above every door in each car of 2 train carriages for a 2-month trial. This new SMRT Active Route Map Information System (STARiS) was then progressively introduced to all C151 trainsets, and subsequently to Siemens C651 and Kawasaki C751B trains for a cost of S$12 million – S$20,000 per car.[74]

Technical dimensions

Captain SMRT demonstrating the use of a refurbished C151's emergency detrainment ramp

The configuration of a C151 in revenue service is DT–M1–M2–M2–M1–DT, where DT is a driving trailer car, M1 is a motor car, and M2 is a motor car with Hostler control, and each car can seat 62 people. M2 is the heaviest car at 38.4 tonnes (37.8 long tons; 42.3 short tons), followed by M1 at 38.3 tonnes (37.7 long tons; 42.2 short tons) and DT at 32.2 tonnes (31.7 long tons; 35.5 short tons). The nominal operation speed for the C151 is 80 kilometres per hour (50 mph), with a maximum speed of 90 kilometres per hour (56 mph); the C151 can also accelerate up to 1 metre per second (3.3 ft/s), with a deceleration of 0.8 metres per second (2.6 ft/s) that could go down to 1.3 metres per second (4.3 ft/s) in emergency situations.[75] The carbody unit includes four equally spaced doorways across the train length, with a curved roof structure to allow the evaporator portion of the split air conditioning system to function. The carbody's maximum vertical loading is about 21,660 kilograms (47,750 lb), or 380 passengers, but its estimated vertical loading during service is around 18,240 kilograms (40,210 lb), or 320 passengers.[76]

Cars of C151
Car Type Driver cab Motor Collector shoe Car length Wheelchair space
mm ft in
DT 23,650[77] 77 ft 7.1 in[77]
M1 22,800[75] 74 ft 9.6 in[75]
M2 22,800[75] 74 ft 9.6 in[75]

Major incidents

Throughout its almost four decade history, the C151 rolling stock was involved in the following high-profile incidents:

  • Clementi rail accident: On 5 August 1993, two C151 trains sets collided at Clementi station because of a 50-litre (11 imp gal; 13 US gal) oil spillage on the track by a maintenance locomotive, resulting in 132 injuries.[78][79]
  • On 17 May 2010, Oliver Fricker trespassed and vandalised Car 1048 with graffiti at Changi Depot.[80][81] The graffiti was initially mistaken for an advertisement and was not spotted until the car was filmed and the video was uploaded to YouTube by a railway enthusiast.[82][83] Fricker was convicted and sentenced to seven months' imprisonment and caning.[83] The public perceived this incident to have serious security implications, as the depot was considered a sensitive installation.[81]
  • In a major MRT disruption on 15 December 2011, a C151 train was stalled in the tunnel and its backup battery failed.[84] The passenger compartments in T139 experienced a blackout and loss of ventilation, leading to one passenger smashing a train door window to avoid suffocation.[84][85] The battery failure led to criticism by the COI on the condition of the aging emergency batteries installed on all C151 trains.[47] SMRT had proposed an upgrading plan to address this issue.[48]
  • Pasir Ris rail accident: On 22 March 2016, two SMRT maintenance trainees were run over and killed by an oncoming C151 train (EMU 073/074) reportedly travelling at 60 km/h, 150 metres from Pasir Ris MRT station, at approximately 11.10 am. The maintenance staff were part of a group of 15 personnel tasked to investigate a possible signalling system fault on the tracks near the Pasir Ris MRT station. This incident led to a 2.5 hour train service disruption, with at least 10,000 commuters affected.[86]
  • 2024 East–West MRT line disruption: On 25 September 2024, a C151 train had a bogie on its third carriage separated from the running rail near Dover station, causing extensive damage to track and equipment between Dover and Jurong East stations. This included 46 rail breaks over 1.6km of track and three track switches. The derailment also caused the train to trip the power supply before stalling outside Ulu Pandan Depot, causing four other trains in service between Clementi and Buona Vista to stall as well.[87][88][89] This incident led to a train service disruption between Jurong East and Buona Vista from 25 September to 30 September 2024 for repair works, making it one of the longest unplanned MRT disruptions in Singapore's history.[89][90] Train services resumed on 1 October 2024 with trains travelling at lower speeds than normal.[91] The incident resulted in SMRT bringing forward C151's retirement date from end-2026 to end of September 2025.[62]

References

Citations

  1. ^ a b c d e f g Sherwell, Chris (12 April 1984). "Kawasaki wins major Singapore metro contract". Financial Times. Factiva. p. 1.
  2. ^ a b c d e f g h i j Dhaliwal, Ray (8 July 1986). "A milestone for the fast track". Straits Times. NewspaperSG (NLB). p. 7. Archived from the original on 7 January 2022. Retrieved 7 January 2022.
  3. ^ a b シンガポールにおける地下鉄電車改修案件の受注について (Press release) (in Japanese). Mitsui (Archived). 3 September 2004. Archived from the original on 13 November 2009. Retrieved 8 November 2008.
  4. ^ "Factsheet: LTA to Decommission First-Generation NSEWL Trains from June 2020". Land Transport Authority. 22 June 2020. Retrieved 14 January 2024.
  5. ^ "Running Status of NSEWL trains". 2011. Retrieved 19 February 2025.
  6. ^ a b c d "First Class Bogies" (PDF). Siemens. Archived from the original (PDF) on 22 July 2019.
  7. ^ "Mitsubishi Electric of Japan has won a contract worth over S$100m to provide the propulsion system for Singapore's Mass Rapid Transit (MRT) trains". Textline Multiple Source Collection. 9 June 1984.
  8. ^ Sherwell, Chris (15 June 1984). "World Trade News: UK group wins Singapore order for braking system". Financial Times. p. 5.
  9. ^ Woodland, Daniel (August 2004). "Optimisation of Automatic Train Protection Systemstion Systems" (PDF). p. Appendix C Page 32 to Page 33. Archived (PDF) from the original on 15 June 2020. Retrieved 15 June 2020.
  10. ^ "THALES Urban Rail Signalling Singapore – North-South / East-West Lines" (PDF). Archived (PDF) from the original on 15 June 2020. Retrieved 16 June 2020.
  11. ^ a b Fang, Joy (2 February 2012). "Coming: $600m upgrade for MRT system/New train measures a 'catch-up'". My Paper. pp. A2, A6. Archived from the original on 18 May 2015. Retrieved 13 May 2015.
  12. ^ a b c d Sherwell, Chris (25 January 1984). "The fight for Singapore's underground : Chris Sherwell in Singapore describes the battle for a major contract". Financial Times. Factiva. p. 10.
  13. ^ a b c Sherwell, Chris (16 April 1984). "Hard work by Japanese on bid rewarded with subway contract". Financial Times. p. IB7.
  14. ^ a b Duffy, Hazel (12 May 1983). "World Trade News: Singapore short-lists UK company for metro". Financial Times. Factiva. p. 4.
  15. ^ Sherwell, Chris (14 November 1983). "Financial Times Survey: Singapore — Speeding into the 1990s — The mass rapid transit project". Financial Times. Factiva. p. 8.
  16. ^ "Models go on show". The Straits Times. 11 January 1984. p. 10. Retrieved 27 June 2024.
  17. ^ "All geared to be a part of the MRT". The Straits Times. 8 January 1984. p. 22. Retrieved 8 August 2025 – via NewspaperSG.
  18. ^ "British, Japanese and Swedish manufacturers are apparently being considered as suppliers of the automatic trains for Singapore's Mass Rapid Transit Corporation". Financial Times. Factiva. 16 February 1984. p. 6.
  19. ^ "Three on MRT shortlist". The Straits Times. 10 April 1984. p. 44. Retrieved 26 June 2024.
  20. ^ Duffy, Hazel (12 January 1984). "Train fault may hinder Singapore metro bid". Financial Times. Factiva. p. 5.
  21. ^ "New coaches built by Metro-Cammell for London Transport have been returned because they are 18mm too wide". Textline Multiple Source Collection. Factiva. 12 January 1984.
  22. ^ "Kawasaki clinches it on price". The Business Times. 12 April 1984. p. 1. Retrieved 11 June 2024.
  23. ^ シンガポール向け地下鉄電車を納入 (in Japanese). Kawasaki Heavy Industries (Archived). Archived from the original on 24 March 2010. Retrieved 8 November 2008.
  24. ^ Sherwell, Chris (12 April 1984). "How Japan finally clinched the deal: The Singapore Underground Contract". Financial Times. Factiva. p. 22.
  25. ^ a b Dhaliwal, Rav (12 April 1984). "Made-in-Japan MRT trains". Straits Times. NewspaperSG (NLB). p. 1.
  26. ^ Barling, Lorne (22 August 1984). "More Metro-Cammell jobs go as orders drop". Financial Times. Factiva. p. 2.
  27. ^ a b c Lee, Constance (11 October 1984). "Mock-up of MRT train to be shown at National Exhibition". Straits Times. NewspaperSG (NLB). p. 1.
  28. ^ a b c d e f g Mass Rapid Transit Corporation (MTRC) and Institution of Engineers Singapore (IES) (April 1987). Mass Rapid Transit System: Proceedings of the Singapore Mass Rapid Transit Conference. Singapore. pp. 411–424. ISBN 978-9971-84-636-7.{{cite book}}: CS1 maint: location missing publisher (link)
  29. ^ "成田の沿革". Narita Mfg, Ltd. Archived from the original on 28 September 2019. Retrieved 12 June 2020.
  30. ^ "Essentially Singaporean - # 2 The MRT". Straits Times. Factiva. 9 August 1992.
  31. ^ a b Dhaliwal, Rav (28 April 1987). "Getting to know the how it will work". Straits Times. p. 19. Archived from the original on 8 April 2016. Retrieved 22 September 2015.
  32. ^ Tan, Sumiko (1996). Kim Seng : a reflection of Singapore's success. george Gascon. Singapore: Kim Seng Publication Committee. ISBN 981-00-8576-1. OCLC 226239890.
  33. ^ Dhaliwal, Ray (11 October 1987). "Thousands turn up for first look at MRT stations". The Straits Times. p. 14. Retrieved 8 August 2025 – via NewspaperSG.
  34. ^ "MRT trains all set for track debut". The Straits Times. 4 June 1986. p. 28. Retrieved 8 August 2025 – via NewspaperSG.
  35. ^ 蘇, 昭旭 (2009). 台灣鐵路火車百科:台鐵·高鐵·捷運 完整版. Taiwan: 人人出版. ISBN 9789867112989. 台北捷運首批C301型捷運列車,感覺非常像新加坡捷運SMRT,用於淡水線。
  36. ^ Leong, Chan Tik (19 August 1994). "Quieter rides on MRT when trains get new wheels – Replacement work starts next month". The Straits Times. p. 25. Retrieved 29 July 2018 – via NewspaperSG.{{cite news}}: CS1 maint: url-status (link)
  37. ^ a b c d e f g h Rajan, T. (5 November 2006). "MRT trains get $145m overhaul". Straits Times.
  38. ^ a b Rajan, T. (5 November 2006). "Upgraded trains can take in 100 more commuters". Straits Times.
  39. ^ Yip, Wai Yee (22 June 2024). "'Those with actual needs': Taiwan mulls over revising priority seat rule after metro, bus disputes". The Straits Times. ISSN 0585-3923. Retrieved 8 August 2025.
  40. ^ a b Popatlal, Asha (30 October 2008). "Train operating standards tightened; Boon Lay Extension to open in Feb". Channel NewsAsia. Archived from the original on 26 February 2009. Retrieved 22 February 2009.
  41. ^ a b Almenoar, Maria (12 November 2008). "Fewer seats on train". Straits Times.
  42. ^ Yew Teck, Chua (9 November 2011). "Refitted SMRT trains should have more seats". Straits Times (Forum).
  43. ^ Yap, Camillus (22 November 2008). "No thanks: Why commuter hasn't taken a train in two years". Straits Times Forum.
  44. ^ Edward Say (26 November 2008). "Seatless cabins won't ease crowded MRT". The Straits Times Forum.
  45. ^ Ee, Eoin (28 November 2008). "More trains, not fewer seats". The New Paper.
  46. ^ Shao Yi, Tan (28 January 2009). "Designs not user-friendly". Straits Times Forum.
  47. ^ a b c Report of the Committee of Inquiry into the Disruption of MRT Train Services on 15 and 17 December 2011, Ministry of Transport, pp. 313-319.
  48. ^ a b Sim, Royston (15 May 2013). "Older SMRT trains to get makeover for better ride". Straits Times. Archived from the original on 24 September 2014. Retrieved 13 May 2015.
  49. ^ Hoe, Pei Shan (5 July 2013). "Older MRT trains to get new motors from Japan". Straits Times. Archived from the original on 19 May 2015. Retrieved 13 May 2015.
  50. ^ Tan, Christopher (2 December 2015). "99 new MRT trains a 'worthy investment' to improve rail reliability: Khaw Boon Wan". The Straits Times. ISSN 0585-3923. Retrieved 8 August 2025.
  51. ^ "Kawasaki to supply final batch of additional MRT trains". The Straits Times. 23 September 2015. ISSN 0585-3923. Retrieved 8 August 2025.
  52. ^ Briginshaw, David (4 July 2013). "Singapore chooses permanent magnet synchronous motors". International Railway Journal. Retrieved 8 August 2025.
  53. ^ Chan Wan Tak, Wendy (18 September 2018). "Update On Sale Of Operating Assets In Conjunction With Transition To The New Rail Financing Framework" (PDF). SBS Transit. Retrieved 8 August 2025.
  54. ^ Kok, Yufeng (27 February 2022). "Refurbished North East Line train to enter service from Feb 28; first of 25 to get mid-life upgrade". The Straits Times. ISSN 0585-3923. Retrieved 8 August 2025.
  55. ^ "Toshiba's Permanent Magnet Synchronous Motor Selected for Singapore Train's Drive Systems". Toshiba Asia Pacific. 4 July 2013. Retrieved 8 August 2025.
  56. ^ "The Rail Report: New Signalling System, Rail Line and Tuas West Extension Opening Next Year". Archived from the original on 26 October 2016. Retrieved 26 October 2016.
  57. ^ "C151 to be replaced". Archived from the original on 28 October 2016. Retrieved 28 October 2016.
  58. ^ "Tender information | Land Transport Authority". www.lta.gov.sg. Archived from the original on 1 August 2018. Retrieved 23 April 2017.
  59. ^ "Bombardier to Supply 66 New Trains for North-South and East-West Lines | Press Room | Land Transport Authority". www.lta.gov.sg. Archived from the original on 25 July 2018. Retrieved 25 July 2018.
  60. ^ "New fleet to replace 66 oldest MRT trains from 2021". Channel NewsAsia. 25 July 2018. Archived from the original on 25 July 2018. Retrieved 25 July 2018.
  61. ^ Chelvan, Vanessa Paige (15 October 2024). "First-generation trains have service life of 38 years, will be replaced by end-2026: Chee Hong Tat". The Straits Times. ISSN 0585-3923. Retrieved 23 October 2024.
  62. ^ a b Lee, Nian Tjoe (7 July 2025) [6 July 2025]. "Over half of 106 new MRT trains added to North-South, East-West lines; fleet completion by 2026". The Straits Times. ISSN 0585-3923. Retrieved 8 August 2025.
  63. ^ 尹云芳 (4 June 2025). 70列第七代列车运抵我国 南北东西线第一代地铁列车下季尽数退场 [70 seventh-generation trains have arrived. The first-generation MRT trains on the North–South and East–West lines will be retired next quarter.] (in Chinese). Lianhe Zaobao. Archived from the original on 4 June 2025. Retrieved 5 June 2025.
  64. ^ Yeo, Mike (20 March 2025) [19 March 2025]. "Safti City high-tech urban training facility launched". The Straits Times. ISSN 0585-3923. Retrieved 8 August 2025.
  65. ^ Ong Guang-Xi, Justin (19 March 2025). "High-rise buildings, loud blasts and MRT train among features at newly-launched SAFTI City". CNA. Retrieved 8 August 2025.
  66. ^ Seah, May (22 May 2023) [3 October 2022]. "In a hijacked MRT train, Rebecca Lim and Andie Chen play enemies not lovers for once". CNA. Retrieved 8 August 2025.
  67. ^ "Trains dirtier? SMRT says it is taking action". Straits Times. 16 October 1991.
  68. ^ Ang, Lay Tee (1 November 1993). "Cleaning facility built to clean exterior of MRT trains". Straits Times Forum. Factiva.
  69. ^ a b "'Next stop, Bishan station' - now by voice synthesizers". Straits Times. Factiva. 16 September 1994.
  70. ^ "MRT train doors are safe, but will have new buzzer". Straits Times. Factiva. 22 February 1997.
  71. ^ Koh, Leslie (22 March 2000). "Smooth Operators at the MRT". Straits Times. NLB.
  72. ^ "Fare Payment Evolution: Interview". Moving Stories. SMRT. Archived from the original on 6 August 2015. Retrieved 7 August 2015.
  73. ^ Tan, Christoper (27 February 1999). "SMRT to test visual passenger info system". Business Times. Factiva.
  74. ^ "SMRT unveils $12m train information system". Business Times (Singapore). Factiva. 8 November 2008.
  75. ^ a b c d e Mass Rapid Transit Corporation 1987, p. 419.
  76. ^ Mass Rapid Transit Corporation 1987, p. 412.
  77. ^ a b Mass Rapid Transit Corporation 1987, p. 411.
  78. ^ Matthew Pereira; Branden Pereira (6 August 1993). "MRT Trains collide at Clementi: 132 hurt". The Straits Times. pp. 1 & 25.
  79. ^ Elias, Rahita (20 October 1993). "Murphy's Law and a 50-litre oil spillage". Business Times (Singapore). Factiva.
  80. ^ "Swiss graffiti man faces Singapore caning". BBC News. 25 June 2010. Archived from the original on 18 June 2015. Retrieved 13 May 2015.
  81. ^ a b "Singapore to cane Swiss man for graffiti terrorism". Daily Telegraph. 25 June 2010. Archived from the original on 18 May 2015. Retrieved 13 May 2015.
  82. ^ Yong, Nicholas (13 June 2010). "Loco about locomotives". Straits Times.
  83. ^ a b Tan, Andrea (18 August 2010). "Swiss Man's Jail Term for Vandalizing Singapore Train Extended". Bloomberg. Archived from the original on 25 May 2015. Retrieved 13 May 2015.
  84. ^ a b Report of the Committee of Inquiry into the Disruption of MRT Train Services on 15 and 17 December 2011, Ministry of Transport, pp. 61-62.
  85. ^ "Man who smashed window 'a hero', says commuter". AsiaOne. 17 December 2011. Archived from the original on 18 May 2015. Retrieved 13 May 2015.
  86. ^ "2 SMRT staff dead in accident near Pasir Ris station". Channel NewsAsia. Archived from the original on 5 November 2017. Retrieved 2 June 2017.
  87. ^ Ang, Hwee Min (26 September 2024). "Faulty train caused 'extensive damage' to track between Clementi and Dover, leading to power trip and disruption". CNA. Retrieved 26 September 2024.
  88. ^ Cheng, Kenneth (26 September 2024). "Train disruption on EWL to go into third day; LTA, SMRT aim to partially restore services on Sept 27". Straits Times. Retrieved 26 September 2024.
  89. ^ a b Ong, Justin (29 September 2024). "East-West Line disruption: No train services from Jurong East to Buona Vista on Sep 30, new cracks found along tracks". CNA. Retrieved 29 September 2024.
  90. ^ Iau, Jean (26 September 2024). "Singapore's MRT train disruption to continue over weekend". South China Morning Post. Retrieved 27 September 2024.
  91. ^ Loi, Esther; Khan, Fatmah (1 October 2024). "East-West Line MRT services back to normal after 6-day disruption". The Straits Times. Retrieved 1 October 2024.

Bibliography

  • Mass Rapid Transit System: Proceedings of the Singapore Mass Rapid Transit Conference, Singapore 6–9 April, 1987. Mass Rapid Transit Corporation. 1987.