C13orf46
C13orf46 | |||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Identifiers | |||||||||||||||||||||||||||||||||||||||||||||||||||
Aliases | C13orf46, uncharacterized LOC100507747, chromosome 13 open reading frame 46 | ||||||||||||||||||||||||||||||||||||||||||||||||||
External IDs | HomoloGene: 139853; GeneCards: C13orf46; OMA:C13orf46 - orthologs | ||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||
Wikidata | |||||||||||||||||||||||||||||||||||||||||||||||||||
|
Chromosome 13 Open Reading Frame 46 is a protein which in humans is encoded by the C13orf46 gene.[3] In humans, C13orf46 is ubiquitously expressed at low levels in tissues, including the lungs, stomach, prostate, spleen, and thymus. This gene encodes eight alternatively spliced mRNA transcript, which produce five different protein isoforms.
Gene
An alternative name for C13orf46 is LOC100507747.[4] C13orf46 spans 47,563 base pairs, contains 11 exons, and is on the minus strand of chromosome 13 at 13q34.[5][6]

Gene neighbors
The neighboring genes around C13orf46 include LINC00454, LINC00452, SWINGN, RASA3, and LOC124903221.[7]
LINC00454 and LINC00452 (Long Intergenic NonProtein Coding RNA 454 & 452) are both long non-coding RNAs (lncRNA) that regulate epigenetic gene expression, chromatin remodeling, and levels of gene transcription and translation.[7][8][9] Both LINC00454 and LINC00452 expression are restricted to the testis. LINC00454 has been associated with Factor X Deficiency while LINC00452 has been found to promote ovarian carcinogenesis.[10][11]
SWINGN (SWI/SNF Complex Interacting GAS6 Enhancer Non-Coding RNA) is also a lncRNA that neighbors C13orf46.[12] SWINGN regulates the activation of the GAS6 (Growth Arrest Specific 6) oncogene, by interacting with matrix associated and actin dependent regulators of chromatin.[13]
The RASA3 (RAS p21 Protein Activator 3) gene encodes the Ras GTPase activating protein. This protein binds inositol 1,3,4,5-tetrakisphosphate to stimulate the activity of Ras p21 and negatively regulates the Ras signaling pathway.[14] RASA3 is most highly expressed in fat, lymph nodes, and the spleen. The encoded protein is localized to the cell membrane.
mRNA
Eight different transcript variants have been identified for C13orf46.[7] These transcript variants are alternatively spliced to include variations of 11 different exons. Depending on the different transcript variant that is translated, 5 different possible protein isoforms are encoded by C13orf46. The most common protein product encoded by C13orf46 is isoform 1, which is 212 amino acids long.[15]
Transcript Variant | mRNA Length (nt) | Protein Isoform | Protein Length (aa) | Molecular Weight (kDA) | Exon 1 (bp) | Exon 2 (bp) | Exon 3 (bp) | Exon 4 (bp) | Exon 5 (bp) | Exon 6 (bp) | Exon 7 (bp) | Exon 8 (bp) | Exon 9 (bp) | Exon 10 (bp) | Exon 11 (bp) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
C13orf46 transcript variant 1 | 3786 | C13orf46 protein isoform 1 | 212 | 23.4 | 269 | 52 | 166 | 48 | 48 | 68 | 3135 | ||||
C13orf46 transcript variant X1 | 26461 | C13orf46 protein isoform X1 | 624 | 66.7 | 3269 | 252 | 1920 | 21020 | |||||||
C13orf46 transcript variant X2 | 26389 | C13orf46 protein isoform X1 | 624 | 66.7 | 3269 | 252 | 20903 | 1965 | |||||||
C13orf46 transcript variant X3 | 25642 | C13orf46 protein isoform X1 | 624 | 66.7 | 3269 | 252 | 19745 | 2376 | |||||||
C13orf46 transcript variant X4 | 26573 | C13orf46 protein isoform X2 | 587 | 62.8 | 3269 | 252 | 23052 | ||||||||
C13orf46 transcript variant X5 | 29437 | C13orf46 protein isoform X3 | 212 | 23.4 | 269 | 52 | 166 | 48 | 48 | 68 | 3337 | 25449 | |||
C13orf46 transcript variant X6 | 961 | C13orf46 protein isoform X4 | 192 | 21.1 | 269 | 52 | 166 | 48 | 48 | 68 | 310 | ||||
C13orf46 transcript variant X7 | 833 | C13orf46 protein isoform X5 | 175 | 18.9 | 269 | 52 | 166 | 48 | 246 | 52 |
Protein
The primary protein isoform of the C13orf46 gene consists of 212 amino acids.[15][16] The longest encoded isoform, known as C13orf46 protein isoform X1, is 624 amino acids long.[17] Other protein isoforms encoded by the C13orf46 gene are similar to either of these two versions of the C13orf46 protein. Varying forms of the primary 212 amino acid protein is encoded by transcript variants 1, X5, X6, and X7. Variations of the longest C13orf46 protein isoform are encoded by transcript variants X1, X2, X3, and X4.
Protein isoform 1
Properties and composition
C13orf46 Isoform 1 has a theoretical isoelectric point of 4.84 and a predicted molecular weight of 23.4 kDA.[18] Higher relative amounts of glutamic acid (15.1%) and aspartic acid (7.5%) are found within this isoform, while the amino acids phenylalanine (0.9%) and threonine (0.5%) are found to be less abundant within the protein composition.[19] C13orf46 Isoform 1 also has a glutamic acid rich region where multiple glutamic acid and lysine doublets are present, some of which occur side by side. A total of 14 multiplets are found within the protein overall, 12 of which are charged.[19] C13orf46 Isoform 1 is not predicted to contain any charge clusters, hydrophobic segments, or transmembrane segments.
Structure

C13orf46 Protein Isoform 1 is predicted to consist of 7 alpha helices and 2 beta strands in addition to regions of random free coils.[21][20]
Domains and motifs
C13orf46 Isoform 1 has two identified disordered regions spanning between amino acid residues 1 through 148 and 168 to 190.[22] In addition, C13orf46 Isoform 1 has a glutamic acid rich region spanning along amino acid residues 109 to 191.[19]
Regulation and post translational modifications
C13orf46 Isoform 1 is predicted to undergo several post-translational modifications such as phosphorylation,[23][24][25] O-GlcNAcylation,[24] mucin type GalNAc O-glycosylation,[24] palmitoylation,[26][27] and sumoylation.[28] PKA, PKC, CKII, PKG, GSK3, cdc2, RSK, and ATM are kinases that are predicted to bind and phosphorylate the human C13orf46 Isoform 1. There is also one predicted phosphoprotein-binding phosphosite on the protein.[29]


Protein isoform X1
Properties
C13orf46 Isoform X1 has a theoretical isoelectric point of 9.33 and a predicted molecular weight of 66.7 kDA.[18] C13orf46 Isoform X1 protein contains much higher relative amounts of serine (18.4%) and leucine (18.8%) compared to other human proteins and also has high amounts of proline (14.4%).[19] Roughly equal amounts of serine and leucine are found within the protein. C13orf46 Isoform X1 protein is also composed of lower than usual amounts of glutamic acid (1.3%), phenylalanine (0.3%), and lysine (0.5%) and also has low amounts of valine (2.4%).[19] Asparagine is not found within the C13orf46 Isoform X1 protein. Within this isoform, 100 amino acid multiplets are found, 5 of which are charged. No charge clusters, hydrophobic segments or transmembrane domains are predicted within the protein.[19]
Structure
C13orf46 Isoform X1 is predicted to consist of a combination of alpha helices, beta sheets, and free random coil regions.[33] There are 22 predicted alpha helices and 18 predicted beta sheets within the predicted structure of C13orf46 Isoform X1.


C13orf46 Isoform X1 contains a series of 26 repeats, which vary in sequence structure and length.[19][35] Out of the 26 identified repeat sequences, 14 sequences consisted of 20 amino acids, while 5 of the repeats consisted of 21 amino acids, 3 repeats consisted of 22 amino acids, and 4 repeats were 23 amino acids long.[36] Each repeat sequence beings with either the amino acid methionine, isoleucine, or leucine. The main sequence structure of the amino acids within the 26 repeats is MLLLSTGCSSSPPDAPPLHQ.[34] An alignment of the 26 repeats indicate that the most conserved part of the repeat sequence occurs in the middle of the sequences with a triplet of the amino acid serine.[36][37]

Domains and motifs
C13orf46 Isoform X1 has a predicted a dimerization domain between amino acids residues 69 to 87.[38]
Regulation and post translational modification
C13orf46 Isoform X1 is predicted to undergo several post-translational modifications such as phosphorylation,[23][24][25] O-GlcNAcylation,[24] mucin type GalNAc O-glycosylation,[24] palmitoylation,[26][27] and sumoylation.[28] The human C13orf46 Isoform X1 protein also has 11 predicted PPBD-specific binding phosphosites.[29] The most conserved phosphorylation sites occur on the third serine of 23 out of 26 repeats. PKC, PKG, PKA, p38MAPK, GSK3, DNAPK, CKI, cdk5, CKII, and cdc2 are kinases predicted to bind and phosphorylate the human C13orf46 Isoform X1 protein.[24] Predicted phosphorylated sites are also predicted to be sites where O-glycosylation can occur.[24]


Protein interactions
C13orf46 protein isoform X1 has several predicted S-phase cyclin binding sites, in addition to MAPK and p38 interacting motifs.[40]
Expression
RNA sequencing shows the expression of C13orf46 is most observed in the lungs, prostate, pancreas, and stomach at intermediate levels.[7][41] C13orf46 also has lower expression levels in the bone marrow, spleen, thyroid, lymph node, gall bladder, and thymus.
Cellular localization
C13orf46 Isoform 1 is predicted to be mostly localized within the nucleus.[42][24] This protein isoform may also be localized on the cell membrane.[24] C13orf46 Isoform X1 is predicted to be mostly localized within the nucleus[42][24] or cytoplasm.[24]
Homology
Orthologs
The C13orf46 gene has orthologs to the human C13orf46 isoform 1 protein and C13orf46 isoform X1 protein, found within primates, mammals, birds, reptiles, fish, and invertebrates.[43]
Isoform 1
Orthologs to the human C13orf46 isoform 1 protein are only known to be found in primates and mammals, suggesting that this part of the C13orf46 gene encoding the C13orf46 isoform 1 protein appeared around 99 million years ago.[43]

Genus and Species | Common Name | Taxonomic Group | Median Date of Divergence (mya) | Accession # | Sequence Length (aa) | Sequence Identity (%) | Sequence Similarity (%) |
---|---|---|---|---|---|---|---|
Homo sapiens | Human | Primates | 0 | NP_001352384.1 | 212 | 100.0% | 100.0% |
Pan paniscus | Bonobo | Primates | 6.4 | XP_034792262.1 | 212 | 98.1% | 98.1% |
Gorilla gorilla gorilla | Western Lowland Gorilla | Primates | 8.6 | XP_030857272.1 | 212 | 95.3% | 98.1% |
Papio anubis | Olive Baboon | Primates | 28.9 | XP_021785522.1 | 212 | 88.7% | 92.5% |
Cercocebus atys | Sooty Mangabey | Primates | 28.9 | XP_011913555.1 | 192 | 87.3% | 91.0% |
Macaca mulatta | Rhesus Macaque | Primates | 28.9 | XP_014977020.1 | 192 | 79.2% | 82.5% |
Ursus arctos | Brown Bear | Carnivora | 87 | XP_048071403.1 | 222 | 59.2% | 71.3% |
Callorhinus ursinus | Northern Fur Seal | Carnivora | 87 | XP_025730354.1 | 184 | 57.5% | 65.6% |
Lontra canadensis | Northern River Otter | Carnivora | 87 | XP_032736869.1 | 232 | 46.4% | 53.6% |
Odobenus rosmarus divergens | Pacific Walrus | Carnivora | 87 | XP_004412327.1 | 310 | 36.4% | 41.7% |
Loxodonta africana | African Bush Elephant | Proboscidea | 87 | XP_010591994.1 | 214 | 62.6% | 73.4% |
Choloepus didactylus | Two-Toed Sloth | Pilosa | 87 | XP_037662557.1 | 214 | 60.7% | 73.8% |
Orycteropus afer afer | Aardvark | Tubulidentata | 87 | XP_007940592.1 | 214 | 60.0% | 69.3% |
Castor canadensis | North American Beaver | Rodentia | 87 | XP_020020073.1 | 217 | 59.6% | 72.0% |
Pteropus giganteus | Indian Flying Fox | Chiroptera | 94 | XP_039734682.1 | 213 | 67.6% | 76.5% |
Eptesicus fuscus | Big Brown Bat | Chiroptera | 94 | XP_028004567.1 | 214 | 65.9% | 75.2% |
Trichechus manatus latirostris | Antillean Manatee | Sirenia | 94 | XP_023589319.1 | 214 | 63.1% | 74.3% |
Balaenoptera musculus | Blue Whale | Cetacea | 94 | XP_036687016.1 | 207 | 57.3% | 69.0% |
Urocitellus parryii | Arctic Ground Squirrel | Rodentia | 94 | XP_026237314.1 | 216 | 61.9% | 72.0% |
Sciurus carolinensis | Eastern Gray Squirrel | Rodentia | 94 | XP_047409299.1 | 238 | 55.6% | 66.1% |
Ictidomys tridecemlineatus | Thirteen-Lined Ground Squirrel | Rodentia | 94 | XP_013221671.2 | 276 | 49.3% | 57.6% |
Chinchilla lanigera | Long-Tailed Chinchilla | Rodentia | 99 | XP_005373979.1 | 217 | 55.5% | 66.4% |
Arvicola amphibius | European Water Vole | Rodentia | 99 | XP_038185081.1 | 237 | 53.1% | 65.1% |
Mesocricetus auratus | Golden Hamster | Rodentia | 99 | XP_005082676.1 | 237 | 51.0% | 61.8% |
Arvicanthis niloticus | African Grass Rat | Rodentia | 99 | XP_034376776.1 | 241 | 50.0% | 61.9% |
Isoform X1
Predicted orthologs to the human C13orf46 isoform X1 protein are found in primates, mammals, birds, reptiles, fish, and as far as back as invertebrates of the bacterial phylum Legionella.[43]
Genus and Species | Common Name | Taxonomic Group | Median Date of Divergence (mya) | Accession # | Sequence Length (aa) | Sequence Identity (%) | Sequence Similarity (%) |
---|---|---|---|---|---|---|---|
Homo sapiens | Human | Primates | 0 | XP_047285937.1 | 624 | 100.0% | 100.0% |
Pan troglodytes | Chimpanzee | Primates | 6.4 | XP_024209271.1 | 720 | 54.9% | 61.0% |
Microtus ochrogaster | Prairie Vole | Rodentia | 87 | KAH0512811.1 | 936 | 10.3% | 15.8% |
Phoca vitulina | European Harbour Seal | Carnivora | 94 | XP_032285971.1 | 510 | 18.8% | 30.1% |
Orcinus orca | Killer Whale | Cetacea | 94 | XP_049556886.1 | 348 | 14.2% | 19.3% |
Myotis davidii | Whiskered Bat | Chiroptera | 94 | ELK34143.1 | 530 | 26.1% | 33.6% |
Phasianus colchicus | Ring-Necked Pheasant | Galliformes | 319 | XP_031464934.1 | 499 | 23.2% | 33.5% |
Corvus hawaiiensis | Hawaiian Crow | Passeriformes | 319 | XP_048182949.1 | 316 | 17.3% | 23.4% |
Hirundo rustica | Barn Swallow | Passeriformes | 319 | XP_039927228.1 | 1185 | 10.0% | 14.9% |
Pelodiscus sinensis | Chinese Soft-Shelled Turtle | Testudines | 319 | XP_025042872.1 | 554 | 17.3% | 26.4% |
Rana temporaria | Grass Frog | Anura | 353 | XP_040201915.1 | 1147 | 12.9% | 19.7% |
Bufo bufo | Common Toad | Anura | 353 | XP_040296088.1 | 259 | 12.3% | 19.7% |
Lithobates catesbeianus | American Bullfrog | Anura | 353 | PIO00716.1 | 245 | 12.0% | 18.5% |
Larimichthys crocea | Large Yellow Croaker | Perciformes | 431 | KAE8277666.1 | 478 | 28.9% | 37.9% |
Coregonus clupeaformis | Lake Whitefish | Salmoniformes | 431 | XP_041725148.2 | 609 | 27.0% | 26.0% |
Austrofundulus limnaeus | Killifish | Cyprinodontiformes | 431 | XP_013856594.1 | 244 | 22.7% | 25.4% |
Oncorhynchus tshawytscha | Chinook Blackmouth Salmon | Salmoniformes | 431 | XP_042158955.1 | 714 | 23.5% | 26.2% |
Salmo salar | Atlantic Salmon | Salmoniformes | 431 | XP_045562793.1 | 324 | 19.9% | 20.9% |
Prochilodus magdalenae | Columbian Freshwater Fish | Characiformes | 431 | KAI4891011.1 | 388 | 18.6% | 25.4% |
Oncorhynchus mykiss | Rainbow Trout | Salmoniformes | 431 | XP_036845983.1 | 332 | 18.5% | 27.3% |
Chiloscyllium punctatum | Brownbanded Bamboo Shark | Orectolobiformes | 464 | GCC17506.1 | 625 | 26.7% | 26.8% |
Biomphalaria glabrata | Freshwater Snail | Basommatophora | 694 | KAI8768938.1 | 308 | 14.4% | 18.9% |
Bulinus truncatus | Freshwater Snail | Basommatophora | 694 | KAH9489149.1 | 879 | 10.3% | 30.7% |
Owenia fusiformis | Bristle Worm | Canalipalpata | 694 | CAH1787814.1 | 224 | 14.3% | 15.2% |
Legionella fallonii | Legionella | Legionellales | 3036 | WP_045095679.1 | 695 | 15.2% | 30.7% |
Paralogs
Human C13orf46 isoform X1 protein has one predicted paralog among mucins, specifically mucin-1.[43] Mucins play a role in creating protective mucus barriers on epithelial tissues.[45] The MUC1 gene is located on chromosome 1 at 1q22, contains 11 exons, and has 22 different isoforms.[46] Mucins are highly O-glycosylated and contain tandem repeat domains abundant with proline, serine, and threonine.[47] Surrounding the repeat domains are cysteine rich regions. Mucin genes do not always share a common ancestry, are prone to convergent evolution, and are grouped based on their functionality instead of common evolutionary history.[48]
References
- ^ a b c ENSG00000283199 GRCh38: Ensembl release 89: ENSG00000283302, ENSG00000283199 – Ensembl, May 2017
- ^ "Human PubMed Reference:". National Center for Biotechnology Information, U.S. National Library of Medicine.
- ^ a b c "C13orf46 chromosome 13 open reading frame 46 [Homo sapiens (human)] - Gene - NCBI". www.ncbi.nlm.nih.gov. Retrieved 2022-12-15.
- ^ "GEO Profile Links for Gene (Select 100507747) - GEO Profiles - NCBI". www.ncbi.nlm.nih.gov. Retrieved 2022-12-17.
- ^ "Homo sapiens chromosome 13, GRCh38.p14 Primary Assembly". 2022-04-06.
- ^ "C13orf46 Gene - CM046 Protein | CM046 Antibody". GeneCards. Retrieved 2022-12-14.
- ^ a b c d "C13orf46 chromosome 13 open reading frame 46 [Homo sapiens (human)] - Gene - NCBI". www.ncbi.nlm.nih.gov. Retrieved 2022-12-14.
- ^ "LINC00452 long intergenic non-protein coding RNA 452 [Homo sapiens (human)] - Gene - NCBI". www.ncbi.nlm.nih.gov. Retrieved 2022-12-15.
- ^ Zhang X, Wang W, Zhu W, Dong J, Cheng Y, Yin Z, Shen F (November 2019). "Mechanisms and Functions of Long Non-Coding RNAs at Multiple Regulatory Levels". International Journal of Molecular Sciences. 20 (22): 5573. doi:10.3390/ijms20225573. PMC 6888083. PMID 31717266.
- ^ "Alliance of Genome Resources". www.alliancegenome.org. Retrieved 2022-12-15.
- ^ Yang J, Wang WG, Zhang KQ (November 2020). "LINC00452 promotes ovarian carcinogenesis through increasing ROCK1 by sponging miR-501-3p and suppressing ubiquitin-mediated degradation". Aging. 12 (21): 21129–21146. doi:10.18632/aging.103758. PMC 7695380. PMID 33168781.
- ^ "SWINGN SWI/SNF complex interacting GAS6 enhancer non-coding RNA [Homo sapiens (human)] - Gene - NCBI". www.ncbi.nlm.nih.gov. Retrieved 2022-12-15.
- ^ Grossi E, Raimondi I, Goñi E, González J, Marchese FP, Chapaprieta V, et al. (February 2020). "A lncRNA-SWI/SNF complex crosstalk controls transcriptional activation at specific promoter regions". Nature Communications. 11 (1): 936. Bibcode:2020NatCo..11..936G. doi:10.1038/s41467-020-14623-3. PMC 7028943. PMID 32071317.
- ^ "RASA3 RAS p21 protein activator 3 [Homo sapiens (human)] - Gene - NCBI". www.ncbi.nlm.nih.gov. Retrieved 2022-12-15.
- ^ a b "UniProt". www.uniprot.org. Retrieved 2022-12-15.
- ^ "uncharacterized protein C13orf46 [Homo sapiens] - Protein - NCBI". www.ncbi.nlm.nih.gov. Retrieved 2022-12-15.
- ^ "uncharacterized protein C13orf46 isoform X1 [Homo sapiens] - Protein - NCBI". www.ncbi.nlm.nih.gov. Retrieved 2022-12-15.
- ^ a b "Expasy - Compute pI/Mw tool". web.expasy.org. Retrieved 2022-12-15.
- ^ a b c d e f g "SAPS < Sequence Statistics < EMBL-EBI". www.ebi.ac.uk. Retrieved 2022-12-15.
- ^ a b "I-TASSER results". seq2fun.dcmb.med.umich.edu. Retrieved 2022-12-15.
- ^ "AlphaFold Protein Structure Database". alphafold.ebi.ac.uk. Retrieved 2022-12-15.
- ^ "uncharacterized protein C13orf46 [Homo sapiens] - Protein - NCBI". www.ncbi.nlm.nih.gov. Retrieved 2022-12-15.
- ^ a b "GPS 5.0 - Kinase-specific Phosphorylation Site Prediction". gps.biocuckoo.cn. Retrieved 2022-12-15.
- ^ a b c d e f g h i j k l "Services". healthtech.dtu.dk. Retrieved 2022-12-15.
- ^ a b "Motif Scan". myhits.sib.swiss. Archived from the original on 2021-06-02. Retrieved 2022-12-15.
- ^ a b "GPS-Palm: A Graphic Presentation System for Palmitoylation Site Prediction". gpspalm.biocuckoo.cn. Retrieved 2022-12-15.
- ^ a b "GPS-Lipid - Prediction of Lipid Modifications (S-Palmitoylation, N-Myristoylation, S-Farnesylation, S-Geranylgeranylation)". lipid.biocuckoo.org. Retrieved 2022-12-15.
- ^ a b "GPS-SUMO: Prediction of SUMOylation Sites & SUMO-interaction Motifs". sumosp.biocuckoo.org. Archived from the original on 2013-05-10. Retrieved 2022-12-15.
- ^ a b "GPS-PBS - PPBDs–specific binding p-site prediction". pbs.biocuckoo.cn. Retrieved 2022-12-15.
- ^ "IBS: Illustrator for Biological Sequences". ibs.biocuckoo.org. Retrieved 2022-12-15.
- ^ "I-TASSER results". seq2fun.dcmb.med.umich.edu. Retrieved 2022-12-15.
- ^ "iCn3D: Web-based 3D Structure Viewer". www.ncbi.nlm.nih.gov. Retrieved 2022-12-15.
- ^ a b "I-TASSER results". seq2fun.dcmb.med.umich.edu. Retrieved 2022-12-15.
- ^ a b c "WebLogo - Create Sequence Logos". weblogo.berkeley.edu. Retrieved 2022-12-15.
- ^ "Dotlet JS". dotlet.vital-it.ch. Retrieved 2022-12-15.
- ^ a b "Clustal Omega < Multiple Sequence Alignment < EMBL-EBI". www.ebi.ac.uk. Retrieved 2022-12-15.
- ^ "Multiple Sequence Alignment - CLUSTALW". www.genome.jp. Retrieved 2022-12-15.
- ^ "Motif Scan". myhits.sib.swiss. Archived from the original on 2021-06-02. Retrieved 2022-12-15.
- ^ "IBS: Illustrator for Biological Sequences". ibs.biocuckoo.org. Retrieved 2022-12-15.
- ^ "ELM - Search the ELM resource". elm.eu.org. Retrieved 2022-12-17.
- ^ "Tissue expression of C13orf46 - Summary - The Human Protein Atlas". www.proteinatlas.org. Retrieved 2022-12-16.
- ^ a b "PSORT II Prediction". psort.hgc.jp. Retrieved 2022-12-15.
- ^ a b c d e f "BLAST: Basic Local Alignment Search Tool". blast.ncbi.nlm.nih.gov. Retrieved 2022-12-16.
- ^ "Phylogeny.fr: Home". www.phylogeny.fr. Retrieved 2022-12-17.
- ^ Reznik N, Gallo AD, Rush KW, Javitt G, Fridmann-Sirkis Y, Ilani T, et al. (October 2022). "Intestinal mucin is a chaperone of multivalent copper". Cell. 185 (22): 4206–4215.e11. doi:10.1016/j.cell.2022.09.021. PMID 36206754. S2CID 245671675.
- ^ "MUC1 mucin 1, cell surface associated [Homo sapiens (human)] - Gene - NCBI". www.ncbi.nlm.nih.gov. Retrieved 2022-12-16.
- ^ Pinzón Martín S, Seeberger PH, Varón Silva D (2019). "Mucins and Pathogenic Mucin-Like Molecules Are Immunomodulators During Infection and Targets for Diagnostics and Vaccines". Frontiers in Chemistry. 7: 710. Bibcode:2019FrCh....7..710V. doi:10.3389/fchem.2019.00710. PMC 6817596. PMID 31696111.
- ^ Pajic P, Shen S, Qu J, May AJ, Knox S, Ruhl S, Gokcumen O (August 2022). "A mechanism of gene evolution generating mucin function". Science Advances. 8 (34): eabm8757. Bibcode:2022SciA....8M8757P. doi:10.1126/sciadv.abm8757. PMC 9417175. PMID 36026444.